ntpc has commissioned 110 kwp ac microgrid solar pv project at greater noida, dist. gautam buddha nagar, uttar pradesh on 8th june, 2017. an ac microgrid test bed of 110 kwp solar pv with demand side management to cater three phase critical loads has been installed and commissioned at ntpc energy technology research alliance centre (netra), the r&d arm of ntpc. the system architecture and centralized control has been designed in-house to monitor and control all generating sources, storage and loads. the system is designed to maximize the pv generation in case of grid interruptions. [info as of: jun. 17]

Greater Noida, Uttar Pradesh

Project ID: 3233

Amount(Approx):

Read More

Commissioned

NTPC Limited

ntpc is planning a municipal solid waste to energy project at badarpur thermal power station, dist. south delhi, delhi. online bids on two stage bidding basis have been invited for epc package for setting up 400 tpd municipal solid waste to energy project (international competitive bidding). the scope of supply and service for the package shall include design, engineering, manufacturing, supply, packing and forwarding, transportation, unloading, storage, installation and commissioning of components of 400 tpd waste to energy plant in full epc basis. documents can be downloaded till 10th august, 2017. the last date for online submission of bids is 7th september, 2017. [info as of: jul. 17]

Badarpur Thermal Power Station, Delhi

Project ID: 3177

Amount(Approx):

Read More

Planning Stage

NTPC Limited

ntpc is planning a 50x5 mw wind-based power project (s) in gujarat, andhra pradesh, karnataka and madhya pradesh. e-bids have been invited on single stage two envelope basis (i.e. envelope-i: techno-commercial bid and envelope-ii: price bid) for wind energy project(s). the scope of work includes engineering, procurement and construction (epc) contract for a wind energy project of total capacity 250 mw ( 5) (5x50 mw (5)) at suitable site(s) with its comprehensive operation & maintenance for an initial period of ten (10) years. document can be downloaded till 7th july, 2017. the last date for submission of online bids is 4th august, 2017. [info as of: jun. 17]

, Karnataka

Project ID: 3061

Amount(Approx):

Read More

Planning Stage

NTPC Limited

ntpc is planning a 50x5 mw wind-based power project (s) in gujarat, andhra pradesh, karnataka and madhya pradesh. e-bids have been invited on single stage two envelope basis (i.e. envelope-i: techno-commercial bid and envelope-ii: price bid) for wind energy project(s). the scope of work includes engineering, procurement and construction (epc) contract for a wind energy project of total capacity 250 mw ( 5) (5x50 mw (5)) at suitable site(s) with its comprehensive operation & maintenance for an initial period of ten (10) years. document can be downloaded till 7th july, 2017. the last date for submission of online bids is 4th august, 2017. [info as of: jun. 17]

, Karnataka, Andhra Pradesh, Gujarat, Madhya Pradesh

Project ID: 2937

Amount(Approx):

Read More

Planning Stage

NTPC Limited

ntpc is planning the 5x50 mw mandsaur solar pv power project in dist. mandsaur, madhya pradesh. the board of directors of the company at its meeting held on 30th march, 2016, has accorded investment approval for the project at an appraised estimated cost of rs. 15.0277 billion. [info as of: apr. 16] ntpc is planning the 50 mw mandsaur solar pv power project in dist. mandsaur, madhya pradesh. bharat heavy electricals (bhel) has secured a contract worth rs. 2.82 billion for setting up the power plant on engineering, procurement and construction (epc) basis. the project is scheduled for completion in 12 months. [info as of: apr. 16]

, Madhya Pradesh

Project ID: 2843

Amount(Approx):

Read More

Completed

NTPC Limited

ntpc is planning a 3x800 mw coal-based super critical power plant at village gajamara, dist. dhenkanal, odisha. an mou was signed on 16th december, 2016 between ntpc and national aluminium company (nalco) for developing power projects and other business collaborations in india. under the mou, the companies will float a joint venture company namely, ntpc-nalco power company (nnpc) to set up power plants. both the companies will initiate the efforts on fast track and necessary modalities like the joint venture agreement, power purchase agreement etc. will be finalized by the end of the current financial year. the first such power plant is planned at gajamara, odisha with a capacity of 3x800 mw, at an estimated investment of rs. 140 billion. the power plant with state-of-the-art technology will supply uninterrupted power to nalcos smelter at angul. coal from the mines allocated to nalco shall be linked to the joint venture project at gajmara. this project will supply about 2,400 mw power to meet the captive power requirement of nalco for its proposed rs. 120 billion, 600,000 tpa greenfield aluminium smelter plant at kamakhya nagar, dhenkanal and a rs. 100 billion brownfield expansion of its aluminium smelter at angul, odisha entailing additional capacity of 500,000 tpa. other details shall be furnished when the jv agreement shall be finalized and executed between ntpc and nalco. the process for acquisition of 1,600 acres of land in gajamara has commenced. [info as of: dec. 16]

Village Gajamara, Odisha

Project ID: 2489

Amount(Approx): Estimated Cost: Rs. 140 billion

Read More

Planning Stage

NTPC Limited

ntpc is planning modernization of its thermal power plants across india. the company has already been given the in-principle clearance to replace around 11,000 mw of its old, inefficient thermal power plants, older than 25 years, with modern energy efficient super critical ones. the plants would be replaced in about five years, with an investment of around rs. 500 billion. [info as of: dec. 16]

All over India,

Project ID: 2358

Amount(Approx): Estimated Cost: Rs. 500 billion

Read More

Planning Stage

NTPC Limited

promoter name: ntpc limited project name: talaipalli coal mining project in dist. raigarh, chhattisgarh project type : new unit status : planning stage state : chhattisgarh district : raigarh location : villages talaipalli, bichinara, nayarampur, kudurmoha, raikera, chotiguda, ajiigarh, & salehpali land : unknown product-capacity : coal - (18-mtpa ) civil work: unknown current status : as of march 2017, the board of directors of the company has accorded investment approval for the project at an appraised current estimated cost of rs. 30,040 million. start date : unknown end date : unknown

Villages Talaipalli, Bichinara, Nayarampur, Kudurmoha, Raikera, Chotiguda, Ajiigarh, & Salehpali, Chhattisgarh

Project ID: 2319

Amount(Approx):

Read More

Planning Stage

NTPC Limited

ntpc has commissioned a 100 kwp floating solar photo voltaic power plant at rajiv gandhi combined cycle power plant, kayamkulam, dist. alappuzha, kerala on 10th march 2017. this floating platform has been indigenously developed by netra (ntpc energy technology research alliance), the r&d arm of ntpc, in collaboration with central institute of plastic engineering & technology (cipet), chennai and patent has been applied. the system was installed by swelect energy systems, chennai with support from netra & ntpc kayamkulam station. [info as of: mar. 17]

Kayamkulam, Kerala

Project ID: 2169

Amount(Approx):

Read More

Commissioned

NTPC Limited

ntpc is implementing the 50 mw rojmal wind power plant at village rojmal, dist. bhavnagar, gujarat. the company board had approved its first wind energy project to be set up at a cost of rs. 3,233.5 million & inox wind had bagged an order for setting up the project on turnkey basis in december 2016. based on the contract inox wind will supply & install 25 units of its advanced 2 mw dfig 100 rotor diameter wind turbine generators. out of 50 mw, 2 mw has been commissioned in april 2017 and the remaining is under construction. [info as of: apr. 17]

Village Rojmal, Gujarat

Project ID: 2160

Amount(Approx): Estimated Cost: Rs. 3,233.5 million

Read More

Under Implementation

NTPC Limited

ntpc is planning the 3x800 mw kudgi super thermal power project stage i at kudgi, dist. bijapur, karnataka. sunil hitech engineers has received a contract worth rs. 830 million from doosan chennai works for erection, testing and commissioning of boiler of u-iii. [info as of: nov. 12] ntpc is planning the (3x800) 2400 mw kudgi super thermal power project stage-i at kudgi, dist. bijapur, karnataka. ivrcl has been awarded a contract for construction of sg area and offsite civil works package. [info as of: jan. 14] ntpc is planning the (3x800) 2,400 mw kudgi super thermal power project stage-i at kudgi, dist. bijapur, karnataka. the company has entered into foreign currency loan agreements with the japan bank for international co-operation (jbic) for approx. rs. 26.5 billion (inclusive of auraiya power project) for the project on 25th january, 2014 in new delhi. the company signed a term loan of usd 350 million with the jbic to finance the supplies and services from japan as well as india for the kudgi super thermal power project stage-i. in the loans, 60 of the amount is provided by jbic and the balance by commercial banks under nexi guarantee. [info as of: feb. 14] ntpc is planning the 3x800 mw stage-i kudgi super thermal power project at kudgi, dist. bijapur, karnataka. unity infraprojects has been awarded contract for township package for the project worth rs. 2.4858 billion. the project is planned for completion within a period of 24 months. [info as of: jun. 15] ntpc is implementing the 3x800 mw stage-i kudgi super thermal power project at kudgi, dist. vijayapura, karnataka. civil work is in progress. e-tenders have been invited on single stage two envelope basis (i.e. envelope-i : techno-commercial bid and envelope-ii: price bid) with reverse auction for ash dyke package for the project on domestic competitive bidding basis. the scope of work includes the construction of starter ash dyke, covering two storage lagoons & one common over flow lagoon for bottom ash slurry disposal and one storage lagoon & sedimentation basin for fly ash disposal by hcsd system. construction of two well type water escape structures & spillways is envisaged for decanting the water. construction of rcc channel from wes of the ba lagoon to ofl is also envisaged for discharging decanted water. the company intends to finance the package through domestic commercial borrowings. documents can be downloaded from 3rd june, 2015 to 24th june, 2015. the last date for online submission of bids is 10th july, 2015. [info as of: nov. 15] ntpc is implementing the 3x800 mw stage-i kudgi super thermal power project at village kudgi, dist. vijayapura, karnataka. sunil hitech engineers has received letter of award for ash dkye package for the project valued at rs. 1830.3 million. the project shall be completed within 30 months from the date of letter of award. civil work is in progress for stage-i. [info as of: oct. 12]

Village Kudgi, Karnataka

Project ID: 2133

Amount(Approx):

Read More

Under Implementation

NTPC Limited

ntpc is implementing the 2x660 mw solapur super thermal power project in dist. solapur, maharashtra. bgr energy systems, chennai has received the letter of award for supply of 2x660 mw super-critical boilers at an approximate order value of rs. 18,550 million. the execution period of the contract is 48 months. [info as of: apr. 16] ntpc is implementing the 2x660 solapur super thermal power project at villages fatatewadi and ahirwadi, dist. solapur, maharashtra. power mech projects has received the order for piping erection of unit-ii of the project from alstom bharat forge power for an amount of rs. 88.6 million excluding service tax. the project is under implementation. unit-i is expected to be completed in december 2016. unit-ii is expected to be completed in h1 2017. [info as of: apr. 12]

Villages Fatatewadi And Ahirwadi, Maharashtra

Project ID: 2132

Amount(Approx):

Read More

Under Implementation

NTPC Limited

promoter name: ntpc limited project name: feroze gandhi unchahar thermal power plant in dist. rae bareli, uttar pradesh project type : new unit status : commissioned state : uttar pradesh district : raebareli location : unchahar land : unknown product-capacity : electricity (unit-6) - (500-mw ) associated company : appointed - bharat heavy electricals limited - contractor civil work: unknown current status : as of april 2017, the project was commissioned on 3rd april, 2017. bharat heavy electricals was awarded the contract for the manufacture, supply, erection and commissioning of boiler, turbine, generator & associated auxiliaries, electricals, switchyard and station controls & instrumentation. the key equipment for the project has been manufactured by bhel at its haridwar, trichy, hyderabad, ranipet and bengaluru works, while the construction of the plant was undertaken by the companys power sector - northern region. all the existing 5 units of 210 mw at fgutpp, have also been commissioned earlier by bhel. [ start date : unknown end date : april-2017

Unchahar, Uttar Pradesh

Project ID: 2103

Amount(Approx):

Read More

Commissioned

NTPC Limited

ntpc is planning the 4x65 mw bhadla solar pv project in rajasthan. the board of directors of the company at its meeting held on 30th march, 2016, has accorded investment approval for the project at an appraised estimated cost of rs. 16.0127 billion. [info as of: apr. 16]

Bhadla, Rajasthan

Project ID: 2006

Amount(Approx):

Read More

Commissioned

NTPC Limited

national thermal power corporation is planning to mine 7 mtpa coal from the chatti bariatu coal mine block, a 243 million ton coal reserve block in north karanpura coalfield, dist. hazaribagh, jharkhand. land acquisition is in progress. [info as of: may 11] national thermal power corporation is planning the 7 mtpa chatti bariatu coal mine project at north karanpura coalfields, dist. hazaribagh, jharkhand. land acquisition is in progress. the project is planned for completion in december 2012. [info as of: mar. 16] ntpc is planning development and operation of the 7 mtpa chatti bariatu coal block in dist. hazaribagh, jharkhand. online bids on single stage two envelope bidding basis have been invited for the project on international competitive bidding basis. total area of the allotted coal block is 646.23 hectares. the mining plan and mine closure plan of chatti bariatu block is already approved by ministry of coal for a targeted capacity of 7 mtpa. environment clearance and forest clearance has been granted by moef. the total mineable reserve in the block is 151.80 million tones. the scope of work includes facilitation to acquire land, supply-cum-installation-cum civil works of cross country conveyor system, construction of r&r colony, providing all manpower including statutory manpower, excavation of various rocks/ earth cutting by mechanized means, mining of rom coal, loading, transportation, dumping, dozing, crushing the coal to a pre-determined size, leveling at ob dumping site to ensure progressive mine closure, construction, operation & maintenance of related infrastructure facilities like mine end coal handling plant, equipment workshop, power distribution arrangement from main receiving station (mrs), electrical substations, statutory buildings & pumping arrangements etc., haul road maintenance, delivery of crushed coal to ntpc at the pre-determined delivery point, etc. documents can be downloaded till 11th april, 2016. the last date for submission of bids is 4th may, 2016. [info as of: dec. 09]

North Karanpura Coalfields, Jharkhand

Project ID: 1360

Amount(Approx):

Read More

Planning Stage

NTPC Limited

promoter name: ntpc limited project name: upgradation of the ramagundam super thermal power plant in dist. karimnagar, telangana project type : up gradation status : planning stage state : telangana district : karimnagar location : village ramagundam land : unknown product-capacity : electricity associated company : appointed - ge power india limited - contractor civil work: unknown current status : as of january 2017, ge power india has been awarded a contract worth approximately rs. 1,988 million by ntpc alstom power services (a 50:50 jv between ntpc and ge) for steam turbine upgrade project at the ramagundam stpp. the scope of work consists of supply of steam turbine module, its auxiliaries, turbine controller and spares including supervision of erection, commissioning and testing. the project comprises of stage-i: 3x200 mw, stage-ii: 3x500 mw, stage-iii: 1x500 mw. start date : unknown end date : unknown

Village Ramagundam, Telangana

Project ID: 1272

Amount(Approx):

Read More

Planning Stage

NTPC Limited

ntpc is planning development of the dulanga coal block at dulanga, dist. sundergarh, orissa. tenders have been floated for development and operation of dulanga coal block. the scope of the work includes land acquisition, construction of r&r colony, providing all manpower including statutory manpower, removal of overburden and dumping the same at the designated sites, mining rom coal, loading of coal into trucks, transportation from the coal face to the crushers, crushing of coal, stockpiling and reclamation, coal conveying to starting point of owner built mgr system & loading of coal to railway wagons, construction, operation and maintenance of the fixed infrastructure facilities (including mine end chp), construction, operation and maintenance of silo load out, laying of power transmission line from darlipalli stpp/discom to main receiving station, road transportation, discharge of crushed coal up to silo/ wharf wall and compliance to all statutory requirements and mine closure, etc. document sale starts on 21st may, 2014 & ends on 11th june, 2014. the last date for submission of bids is 4th july, 2014. [info as of: jan. 16] ntpc is planning development of the dulanga coal block at dulanga, dist. sundergarh, odisha on 654.11 hectares. e-tenders have been invited (international competitive bidding) for development and operation of dulanga coal block on single stage two envelope bidding basis (envelope-i: techno-commercial bid & envelope-ii: price bid). dulanga block was allocated to ntpc under captive mode. it is located in the ib valley coalfield lying in the south eastern extremity of nw-se trending master basin belt of sone mahanadi valley. revised mining plan and mine closure plan of dulanga block is already approved by ministry of coal for a targeted capacity of 7 mtpa. environment clearance has been accorded by moef, stage-i & stage-ii. forest clearance has been granted by moef and consent to establish has also been issued by odisha pollution control board. total estimated mineable reserves within the block are 152.05 million tonnes. mdos scope is to facilitate to acquire all the land on behalf of owner, provide personnel, mining equipment and other equipment and services for efficient mining of coal from the block and supply such coal to the owner in accordance with the project agreement. documents can be downloaded till 26th february, 2016. the last date for submission of bids is 17th march, 2016. [info as of: may 14]

Dulanga, Odisha

Project ID: 1162

Amount(Approx): Estimated Cost: Rs. 10,534.1 million

Read More

Planning Stage

NTPC Limited

ntpc is planning the 2x800 mw telangana super thermal power project (tstpp), phase-i at ramagundam, dist. karimnagar, telangana. the project will come up in the premises of ntpc ramagundam. the board has accorded investment approval for the project at current estimated cost of rs. 105.99 billion. ppas have been signed with southern power distribution company of telangana and northern power distribution company of telangana. the commercial operation date (cod) of first unit is envisaged in 52 months and second unit at an interval of 6 months thereafter. [info as of: aug. 16] ntpc is planning the 4,000 mw telangana super thermal power project (tstpp) at village ramagundam, dist. karimnagar, telangana. stage-i will comprise of 2x800 mw and stage-ii will comprise of 3x800 mw. the project will come up on available land in the premises of ntpcs existing ramagundam station which already consists of stage-i: 3x200 mw, stage-ii: 3x500 mw, stage-iii: 1x500 mw. an investment approval of rs. 105,989.8 million has been accorded for the project. ministry of coal vide letter dated 10.09.15 informed that mandakini-b coal mine in odisha has been allotted to ntpc for the tstpp. as an interim arrangement till the development of this mine, tapering coal linkage for telangana stage-i shall be provided from wcl. foundation stone for tstpp stage-i was laid on 7th august, 2016. [info as of: jan. 16]

Village Ramagundam, Telangana

Project ID: 1092

Amount(Approx):

Read More

Under Implementation

NTPC Limited

national thermal power corporation is planning to mine 15 mtpa coal from the pakri barwadih coal mine, a 3319.42 hectare, 1436 million ton coal reserve block in north karanpura coalfield, dist. hazaribagh, jharkhand. the capital expenditure is rs. 45,000 million. land acquisition is in progress. [info as of: oct. 15] ntpc is planning the 15 mtpa pakri barwadih coal mining project in jharkand on 4,260 hectares. the board of directors of ntpc has approved m/s thriveni- sainik, a jv between thriveni earthmovers and sainik mining, as mine developer cum operator (mdo) for the project for a period of 27 years of mining operation. peak annual production will be 15 mtpa. development activities will commence within 2 months. [info as of: dec.09]

, Jharkhand

Project ID: 863

Amount(Approx):

Read More

Completed

NTPC Limited

ntpc is planning a 3x800 mw coal-based super critical power plant at village gajamara, dist. dhenkanal, odisha. an mou was signed on 16th december, 2016 between ntpc and national aluminium company (nalco) for developing power projects and other business collaborations in india. under the mou, the companies will float a joint venture company namely, ntpc-nalco power company (nnpc) to set up power plants. both the companies will initiate the efforts on fast track and necessary modalities like the joint venture agreement, power purchase agreement etc. will be finalized by the end of the current financial year. the first such power plant is planned at gajamara, odisha with a capacity of 3x800 mw, at an estimated investment of rs. 140 billion. the power plant with state-of-the-art technology will supply uninterrupted power to nalcos smelter at angul. coal from the mines allocated to nalco shall be linked to the joint venture project at gajmara. this project will supply about 2,400 mw power to meet the captive power requirement of nalco for its proposed rs. 120 billion, 600,000 tpa greenfield aluminium smelter plant at kamakhya nagar, dhenkanal and a rs. 100 billion brownfield expansion of its aluminium smelter at angul, odisha entailing additional capacity of 500,000 tpa. other details shall be furnished when the jv agreement shall be finalized and executed between ntpc and nalco. the process for acquisition of 1,600 acres of land in gajamara has commenced. [info as of: dec. 16]

Village Gajamara, Orissa

Project ID: 787

Amount(Approx): Estimated Cost: Rs. 140 billion

Read More

Planning Stage

PROJECTS BY LOCATIONS

PROJECT INFORMATION

Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website.