national highways authority of india×

Projects

NATIONAL HIGHWAYS AUTHORITY OF INDIA PIUVISAKHAPATNAM

development of economic corridors, inter-corridors and feeder routes and coastal road primarily to improve the efficiency of freight movement in india under bharatmala pariyojna lot-3/odisha & jharkhand/ package-2, (ch 365.033 - ch 464.662 km)

Visakhapatnam, Andhra Pradesh

Project ID: 4406

Amount(Approx): 254267 Lacs

Read More

New

NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU DHAMTARI

development of economic corridors, inter-corridors and feeder routes and coastal road primarily to improve the efficiency of freight movement in india under bharatmala pariyojna lot-3/odisha & jharkhand/package-2, (ch 0.00 - ch 124.661 km)

Kondagaon , Chhattisgarh

Project ID: 4405

Amount(Approx): 429024 Lacs

Read More

New

NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU SAMBALPUR

development of economic corridors, inter-corridors and feeder routes and coastal road primarily to improve the efficiency of freight movement in india under bharatmala pariyojna lot-3/odisha & jharkhand/package-2, (from ch. 124.661-ch. 365.033)

Koraput, Orissa

Project ID: 4404

Amount(Approx): 809200 Lacs

Read More

New

National Highways Authority Of India

national highways authority of india is planning to upgrade the barhi-koderma section in jharkhand. request for proposal (rfps) have been floated for 4-laning of the barhi-koderma section of nh-31 from km 0.000 to km 27.500 in jharkhand under nhdp phase -iv on engineering, procurement & construction (epc) mode. the estimated cost of the tender work is rs. 2,734.6 million. the scope of work will broadly include rehabilitation, upgradation and augmentation of the existing carriageway to four-lane with paved shoulders standards with construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. and maintenance of the project during the defect liability period, which shall be 4 years. documents can be downloaded till 13th september, 2017. the last date for online submission of bids is 13th september, 2017. the completion period is 2 years & maintenance period is 4 years. [info as of: aug. 17]

, Jharkhand

Project ID: 3707

Amount(Approx):

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning to construct the six lane vadodara kim expressway in gujarat. online rfps have been floated as 5 packages on epc mode. package -i: construction of six lane vadodara kim expressway from km 355.00 to km 378.740 (padra to vadodara section of vadodara mumbai expressway) in the state of gujarat under nhdp phase - vi (phase ia-package i) with a length of 23.740 km. the estimated cost of the tender work is rs. 17,295.3 million. package -ii: construction of six lane vadodara kim expressway from km 323.00 to km 355.00 (sanpa to padra section of vadodara mumbai expressway) in the state of gujarat under nhdp phase - vi (phase ia-package ii) with a length of 32 km. the estimated cost of the tender work is rs. 13,544.4 million. package -iii: construction of six lane vadodara kim expressway from km 292.00 to km 323.00 (manubar to sanpa section of vadodara mumbai expressway) in the state of gujarat under nhdp phase - vi (phase ia-package iii) with a length of31 km. the estimated cost of the tender work is rs. 11,321.8 million. package -iv: construction of six/eight lane vadodara kim expressway from km 279.00 to km 292.00 (ankleshwar to manubar section of vadodara mumbai expressway) in the state of gujarat under nhdp phase - vi (phase ia-package iv) with a length of 13 km. the estimated cost of the tender work is rs. 12,961.6 million. package -v: construction of eight lane vadodara kim expressway from km 254.430 to km 279.000 (kim to ankleshwar section of vadodara mumbai expressway) in the state of gujarat under nhdp phase - vi (phase ia package v) with a length of 24.570 km. the estimated cost of the tender work is rs. 11,557.7 million. the completion period of package i, ii, iii & v are 2 years. the completion period of package iv is 2.5 years. the maintenance period of entire project is 4 years. documents can be downloaded till 25th september, 2017. the last date for online submission of bids is 25th september, 2017. [info as of: aug. 17]

, Gujarat

Project ID: 3706

Amount(Approx):

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning 4-laning of chutmalpur-ganeshpur section and roorkee-chutmalpur-gagalheri section in uttarakhand & uttar pradesh. the estimated cost of the project is rs. 8.0988 billion. online rfps have been invited (international competitive bidding) under single stage bidding process for 4-laning of chutmalpur-ganeshpur section of nh-72a from km 0.000 (km 22.825 of nh-73) to km 16.000 (design chainage km 17.900) and roorkee-chutmalpur-gagalheri section of nh-73 from km 0.000 (km 167.800 of nh-58) to km 33.000 (design chainage 35.400) in uttarakhand and uttar pradesh (length 53.300 km) under nhdp phase-iv on dbot hybrid annuity mode. the scope of work will broadly include rehabilitation, upgradation and widening of the existing carriageway to four-lane standards with construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. including those prescribed in the concession agreement and its schedules and the operation and maintenance thereof. documents can be downloaded till 23rd february, 2016. the last date for online submission of bids is 24th february, 2016. [info as of: apr. 16] national highways authority of india is planning upgradation of chutmalpur-ganeshpur section and roorkee-chutmalpur-gagalheri section in uttarakhand & uttar pradesh. the estimated cost of the project is rs. 8.0988 billion and the bid project cost is rs. 9,420 million. mbl infrastructures has won the contract for 4-laning of chutmalpur-ganeshpur section of nh-72a from km 0.000 (km 22.825 of nh-73) to km 16.000 (design chainage km 17.900) and roorkee-chutmalpur-gagalheri section of nh-73 from km 0.000 (km 167.800 of nh-58) to km 33.000 (design chainage km 35.400) in uttarakhand and uttar pradesh (length 53.300 kms) under nhdp phase-iv on dbot hybrid annuity basis. during construction, 40 of the bid project cost will be funded by nhai and the balance 60 will be arranged by the concessionaire. the construction period is 730 days and the operation period is 15 years commencing from cod. [info as of: sept. 16] national highways authority of india is planning upgradation of the chutmalpur-ganeshpur section on nh-72a and roorkee-chutmalpur-gagalheri section on nh-73 in uttarakhand & uttar pradesh. the project will come up under nhdp-iv on dbot hybrid annuity mode. the estimated cost of the project is rs. 9,420 million. mbl infrastructures is the contractor. land acquisition is in progress. mobilizing of machinery is under progress. work on the project is expected to commence in november 2016 and is planned for completion in 730 days. [info as of: jan. 16]

, Uttar Pradesh, Uttarakhand

Project ID: 3563

Amount(Approx): Estimated Cost: Rs. 8,100 million

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india (nhai) is planning to construct a road connecting beypore port to malaparamba junction in dist. kozhikode, kerala. the ministry of road transport and highways has submitted the proposal to nhai. the project is in initial stage. according to media sources, the road is being proposed for implementation under the sagarmala project of the union government, aimed at spurring port-led development including enhancing port connectivity, or through nhdp programme of nhai. the alignment of the 18.4 km road is planned through the kozhikode beach. the project is that the new road can be constructed without acquiring any existing land. the proposed project starts from beypore port and culminates at malaparamba junction with three sections in between. the first stretch envisages a 13.4 km four-lane road from beypore port to kozhikode beach passing through gotheeswaram, marad, payyanakkal, kothi and ending at south beach. already there are existing roads in the stretch which can be developed. the second stretch would be a 2.9 km long elevated highway from south beach to eranhipalam passing through panikkar road, vellayil, nadakkavu, manorama junction and east nadakkavu. the final stretch would be the 2.1 km four lane road from eranhipalam to malaparamba junction, which is part of the existing mananchira- vellimadukunnu road development project. the proposed road has existing two lane wide roads on most part of the stretch which are proposed to be upgraded to four-lane divided carriageway and an elevated highway. [info as of: aug. 17]

, Kerala

Project ID: 3523

Amount(Approx):

Read More

Announcement/Conceptual Stage

National Highways Authority Of India

national highways authority of india is planning 4-laning of chutmalpur-ganeshpur section and roorkee-chutmalpur-gagalheri section in uttarakhand & uttar pradesh. the estimated cost of the project is rs. 8.0988 billion. online rfps have been invited (international competitive bidding) under single stage bidding process for 4-laning of chutmalpur-ganeshpur section of nh-72a from km 0.000 (km 22.825 of nh-73) to km 16.000 (design chainage km 17.900) and roorkee-chutmalpur-gagalheri section of nh-73 from km 0.000 (km 167.800 of nh-58) to km 33.000 (design chainage 35.400) in uttarakhand and uttar pradesh (length 53.300 km) under nhdp phase-iv on dbot hybrid annuity mode. the scope of work will broadly include rehabilitation, upgradation and widening of the existing carriageway to four-lane standards with construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. including those prescribed in the concession agreement and its schedules and the operation and maintenance thereof. documents can be downloaded till 23rd february, 2016. the last date for online submission of bids is 24th february, 2016. [info as of: apr. 16] national highways authority of india is planning upgradation of chutmalpur-ganeshpur section and roorkee-chutmalpur-gagalheri section in uttarakhand & uttar pradesh. the estimated cost of the project is rs. 8.0988 billion and the bid project cost is rs. 9,420 million. mbl infrastructures has won the contract for 4-laning of chutmalpur-ganeshpur section of nh-72a from km 0.000 (km 22.825 of nh-73) to km 16.000 (design chainage km 17.900) and roorkee-chutmalpur-gagalheri section of nh-73 from km 0.000 (km 167.800 of nh-58) to km 33.000 (design chainage km 35.400) in uttarakhand and uttar pradesh (length 53.300 kms) under nhdp phase-iv on dbot hybrid annuity basis. during construction, 40 of the bid project cost will be funded by nhai and the balance 60 will be arranged by the concessionaire. the construction period is 730 days and the operation period is 15 years commencing from cod. [info as of: sept. 16] national highways authority of india is planning upgradation of the chutmalpur-ganeshpur section on nh-72a and roorkee-chutmalpur-gagalheri section on nh-73 in uttarakhand & uttar pradesh. the project will come up under nhdp-iv on dbot hybrid annuity mode. the estimated cost of the project is rs. 9,420 million. mbl infrastructures is the contractor. land acquisition is in progress. mobilizing of machinery is under progress. work on the project is expected to commence in november 2016 and is planned for completion in 730 days. [info as of: jan. 16]

, Uttar Pradesh, Uttarakhand

Project ID: 3504

Amount(Approx): Estimated Cost: Rs. 8,100 million

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india (nhai) is planning to construct a road connecting beypore port to malaparamba junction in dist. kozhikode, kerala. the ministry of road transport and highways has submitted the proposal to nhai. the project is in initial stage. according to media sources, the road is being proposed for implementation under the sagarmala project of the union government, aimed at spurring port-led development including enhancing port connectivity, or through nhdp programme of nhai. the alignment of the 18.4 km road is planned through the kozhikode beach. the project is that the new road can be constructed without acquiring any existing land. the proposed project starts from beypore port and culminates at malaparamba junction with three sections in between. the first stretch envisages a 13.4 km four-lane road from beypore port to kozhikode beach passing through gotheeswaram, marad, payyanakkal, kothi and ending at south beach. already there are existing roads in the stretch which can be developed. the second stretch would be a 2.9 km long elevated highway from south beach to eranhipalam passing through panikkar road, vellayil, nadakkavu, manorama junction and east nadakkavu. the final stretch would be the 2.1 km four lane road from eranhipalam to malaparamba junction, which is part of the existing mananchira- vellimadukunnu road development project. the proposed road has existing two lane wide roads on most part of the stretch which are proposed to be upgraded to four-lane divided carriageway and an elevated highway. [info as of: aug. 17]

, Kerala

Project ID: 3464

Amount(Approx):

Read More

Announcement/Conceptual Stage

National Highways Authority Of India

national highways authority of india is planning to widen and improve the existing carriageway of rampur to kathgodam section of nh - 87 to 4/6 lane in uttar pradesh. the scope includes 4/6 laning from km 0.000 to km 88.000. the project has been submitted in the 115th meeting infrastructure & miscellaneous projects & crz meeting to be held on 16th & 17th august, 2012. [info as of: dec. 15] national highways authority of india is planning upgradation of rampur-kathgodam section of nh-87 (new nh no. 9) in uttar pradesh. rfps have been invited under 2 packages. [a] package-i: online request for proposals (rfps) have been invited for 4-laning of rampur-kathgodam section of nh-87 (new nh no. 9) from km 0.000 (km 190.000 of nh-24) to km 42.791 (design chainage 43.446) [package-i] in uttar pradesh under nhdp phase-iii on dbot hybrid annuity mode (international competitive bidding under single stage bidding process). estimated cost of package-i is rs. 6.16 billion. package-i length is 43.446 km. documents can be downloaded till 27th january, 2016. the last date for submission of bids is 28th january, 2016. [b] package-ii: online request for proposals (rfps) have been invited for 4-laning of rampur-kathgodam section of nh-87 (new nh no. 9) from km 42.791 (design chainage km 43.446) to km 88.000 (design chainage km 93.226) [package-ii] in uttar pradesh under nhdp phase-iii on dbot hybrid annuity mode (international competitive bidding under single stage bidding process). the estimated cost of package-ii is rs. 5.71 billion. package-ii length is 49.78 km. documents can be downloaded till 28th january, 2016. the last date for submission of the bids is 29h january, 2016. the scope of work will broadly include rehabilitation, upgradation and widening of the existing carriageway to four-lane standards with construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. and the operation and maintenance thereof. [info as of: mar. 16] national highways authority of india is planning upgradation of rampur-kathgodam section of nh-87 in uttar pradesh. tenders invited for 4-laning of rampur-kathgodam section of nh-87 from km 0.000 (km 190.000 of nh-24) to km 42.791 (design chainage 43.446) [package-i] in uttar pradesh under nhdp phase-iii on hybrid annuity mode. the project has been approved by government of india at a tpc (total project cost) of rs. 16,287.6 million under nhdp-iii. forest clearance has been accorded by ministry of environment & forest (moef) and land acquisition notification has been published. [info as of: nov. 16] national highways authority of india is planning four laning of rampur-kathgodam section of nh-87 in uttar pradesh and uttarakhand. sadbhav rudrapur highway (srhpl) & sadbhav nainital highway (snhpl), wholly owned subsidiaries of sadbhav infrastructure project, have achieved financial close within the timelines stipulated in accordance with the concession agreement dated 2nd june, 2016. the details are: 1) srhpl: bid project cost is rs. 7,380 million, term loan is rs. 3,542.4 million, companys contribution is rs. 885.6 million and the term loan tenure (from appointed date) is 16 years. 2) snhpl: bid project cost is rs. 6,570 million, term loan is rs. 3,153.6 million, companys contribution is rs. 788.4 million and the term loan tenure (from appointed date) is 16 years. additionally, srhpl & snhpl have tied-up for over-draft facility during construction period to bridge the timing gap for payment during construction from nhai. also working capital facility has been tiep-up during the operational period. project descriptions are as follows: 1) srhpl: four laning of rampur-kathgodam section of nh-87 (new nh no. 9) from km 0.000 (km 190.000 of nh 24) to km 42.791 (design chainage 43.446) [package-i] in uttar pradesh under nhdp-iii on hybrid annuity mode. the length is 43.45 kms. construction period is 730 days and the operation period from cod is 15 years. 2) snhpl: four laning of rampur-kathgodam section of nh-87 (new nh no. 9, 109) from km 42.791 (design chainage 43.446) to km 88.000 (design chainage 93.226) [package-ii] in uttarakhand under nhdp-iii on hybrid annuity mode. the length is 49.78 kms. construction period is 730 days and the operation period from cod is 15 years. appointed date for both the projects is expected shortly. [info as of: aug. 12]

, Uttar Pradesh

Project ID: 3327

Amount(Approx):

Read More

Under Implementation

National Highways Authority Of India

national highways authority of india is planning to upgrade the nh-248a in dist. gurugram, haryana. online rfps have been floated under single stage bidding process for 6 laning & strengthening of nh-248a from existing km 2.740 (rajiv chowk) to km 11.682 (approximately 8.942 km) in gurugram under nhdp phase-iv in haryana on hybrid annuity mode (international competitive bidding). the estimated cost of the tender work is rs. 6,955.8 million. the scope of work will broadly include rehabilitation, upgradation and widening of the existing carriageway to six-lane standards with construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. including those prescribed in the concession agreement and its schedules and the operation and maintenance thereof. documents can be downloaded till 4th september, 2017. the last date for online submission of bids is 4th september, 2017. [info as of: jul. 17]

, Haryana

Project ID: 3291

Amount(Approx):

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning to upgrade 4-laning of the koderma-meghatari section of nh-31 in dist. koderma, jharkhand. the estimated cost of the project is rs. 2,420.6 million. tenders invited. according to forest clearance sources, the authority has applied for forest clearance for diversion of 44.603 hectares of forest land required for the project for a total period of 100 years. the road will be from km 27.665 to km 47.700 of nh-31. [info as of: jul. 17]

, Jharkhand

Project ID: 3195

Amount(Approx): Estimated Cost: Rs. 2,420.6 million

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning a 4 lane inner ring road in dist. allahabad, uttar pradesh. request for proposals have been invited for preparation of detailed project report of consultancy services for preparation of feasibility report cum details project report (dpr) of 4 lane inner ring road in and around dist. allahabad. the scope of work shall include detailed design of approach road extending at least up to 2 km on either side of the bridge. documents can be downloaded till 11th july, 2017. the last date for online submission of bids is 11th july, 2017. [info as of: jun. 17]

, Uttar Pradesh

Project ID: 2812

Amount(Approx):

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning to construct 7 bridges & underpass along the chennai-trichy bypass on nh-45 in tamil nadu at a cost of rs. 310 million. the project is awaiting approval for dpr preparation. according to media reports, the bridges are aimed at providing seamless connectivity to the service roads on either side of the four-lane national highway-45 on a particular stretch in trichy, the vehicular underpass near kondayampettai will connect kallanai road to srirangam. [info as of: apr. 17]

, Tamil Nadu

Project ID: 2446

Amount(Approx): Estimated Cost: Rs. 310 million

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning six laning and strengthening of the hubli-haveri section of nh-48 in karnataka. online rfps have been invited for independent engineer services for six laning & strengthening of km 340+000 to km 403+400 of hubli-haveri section of nh-48 (old nh-4) in karnataka to be executed on hybrid annuity mode under nhdp phase-v. the length of the road is 63.4 kms. the total project cost is rs. 11,671 million. documents can be downloaded till 17th april, 2017. the last date for submission of bids is 18th april, 2017. the assignment period is 30 months (construction period of 24 months, development & o&m period of 6 months). [info as of: mar. 17]

, Karnataka

Project ID: 2355

Amount(Approx): Verified Cost: Rs. 11,671 million

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning construction of the jatinga to bara narayanpur section in assam. online rfps have been invited for consultancy services for preparation of feasibility study /detailed project report for construction of 2-lane with paved shoulder of jatinga to bara narayanpur section from km 165.40 to km 190.587 on nh-54 of package as-21 (bal) through new alignment in assam on epc mode. documents can be downloaded till 17th april, 2017. the last date for submission of bids is 18th april, 2017. [info as of: mar. 17]

, Assam

Project ID: 2354

Amount(Approx):

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning upgradation of the ramanathapuram to rameshwaram section of nh-49 in tamil nadu. online rfps have been invited for consultancy services for feasibility study and preparation of dpr for upgradation of ramanathapuram to rameshwaram section of nh-49 (63 km.) to four lane. document can be downloaded till 8th may, 2017. the last date for submission of online bids is 8th may, 2017 & physical submission is 9th may, 2017. [info as of: apr. 17]

, Tamil Nadu

Project ID: 2247

Amount(Approx):

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning upgradation of the paramakudi-ramanathapuram section of nh-49 in tamil nadu. online rfps have been invited for consultancy services for feasibility study and preparation of dpr for upgradation of paramakudi to ramanathapuram section of nh-49 (39 km.) to four lane. documents can be downloaded till 8th may, 2017. the last date for submission of online bids is 8th may, 2017 & physical submission is 9th may, 2017. [info as of: apr. 17]

, Tamil Nadu

Project ID: 2246

Amount(Approx):

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning upgradation of the dindigul-tamil nadu-karnataka border (nh-209) highway project in tamil nadu. rfps have been invited for providing consultancy services for feasibility study and preparation of dpr for four laning of dindigul-coimbatore-sathyamangalam and 2 laning with/without paved shoulder from sathyamanglam to tn/karnataka border section of nh-209 ( 210.48 km.) from km 0.00 to km 23.23, km 30.900 to km 123.550, km 150.40 to km 268.00 excluding km 149.00 to km 172.00. document can be downloaded till 8th may, 2017. the last date for submission of online bids is 8th may, 2017 and physical submission of bids is 9th may, 2017. [info as of: apr. 17]

, Tamil Nadu

Project ID: 2245

Amount(Approx):

Read More

Planning Stage

National Highways Authority Of India

national highways authority of india is planning rehabilitation & augmentation of 4-laning of the kutchery chowk-ranchi-piska more-biju para section (nh-75) in jharkhand. sunil hitech engineers has received the order worth of rs. 2,359 million for rehabilitation & augmentation of 4-laning of kutchery chowk-ranchi-piska more-biju para section from km 0.000 to 34.000) of nh-75 in the state of jharkhand on epc mode. [info as of: apr. 17]

, Jharkhand

Project ID: 2244

Amount(Approx):

Read More

Planning Stage

PROJECTS BY LOCATIONS

PROJECT INFORMATION

Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website.