indian railways×

Projects

Indian Railways

government of india, ministry of railways (mor), is planning a rail coach factory at kanchrapara, dist. north 24 parganas, west bengal. the indicative cost of the factory is rs. 10 billion. about 150 acres of railway land is available for the project. request for qualification (rfq) has been floated for setting up the factory. the project will be set up in joint venture (jv), for production & supply of state-of-the-art electrical multiple units (emu), mainline electrical multiple units (memu) & metro coaches, on the basis of life cycle cost & performance criteria. the jv partner shall be selected through open competitive bidding to undertake the work of setting up of the rail coach factory to supply 500 emus, memus & metro coaches per annum, over a period of 10 years. the ministry has decided to enable setting up of a factory to manufacture rail cars of 3660 mm & 3250 mm width powered by a dedicated propulsion system at kanchrapara for supply thereof on the basis of a long term procurement-cum-maintenance contract through public-private partnership (ppp) on build, own & operate (boo) basis. document sale ends on 9th december, 2015. the last date for submission of bids is 10th december, 2015. [info as of: oct. 15]

Kanchrapara, West Bengal

Project ID: 3561

Amount(Approx): Estimated Cost: Rs. 20,000 million

Read More

Planning Stage

Indian Railways

government of india, ministry of railways (mor), is planning a rail coach factory at kanchrapara, dist. north 24 parganas, west bengal. the indicative cost of the factory is rs. 10 billion. about 150 acres of railway land is available for the project. request for qualification (rfq) has been floated for setting up the factory. the project will be set up in joint venture (jv), for production & supply of state-of-the-art electrical multiple units (emu), mainline electrical multiple units (memu) & metro coaches, on the basis of life cycle cost & performance criteria. the jv partner shall be selected through open competitive bidding to undertake the work of setting up of the rail coach factory to supply 500 emus, memus & metro coaches per annum, over a period of 10 years. the ministry has decided to enable setting up of a factory to manufacture rail cars of 3660 mm & 3250 mm width powered by a dedicated propulsion system at kanchrapara for supply thereof on the basis of a long term procurement-cum-maintenance contract through public-private partnership (ppp) on build, own & operate (boo) basis. document sale ends on 9th december, 2015. the last date for submission of bids is 10th december, 2015. [info as of: oct. 15]

Kanchrapara, West Bengal

Project ID: 3502

Amount(Approx): Estimated Cost: Rs. 20,000 million

Read More

Planning Stage

Indian Railways

indian railways is planning a coach manufacturing project in dist. sonipat, haryana. the project is in planning stage and will come up in collaboration with the state government. [info as of: mar. 13]

Barhi Industrial Estate, Haryana

Project ID: 2890

Amount(Approx): Estimated Cost: Rs. 6,000 million

Read More

Planning Stage

Indian Railways

indian railways is planning the bilaspur-manali-leh new broad gauge line (route length 498 kms) in jammu and kashmir. the foundation stone for the final location survey of the project at leh was laid on 27th june, 2017. in order to connect leh with a broad gauge railway line with the rest of india, indian railway has taken up final location survey, a precursor to actual construction from bilaspur to leh via manali. the alignment shall connect mandi, kullu, manali, keylong and other important towns of himachal pradesh & jammu & kashmir states enroute. the line from bilaspur shall be further connected to bhanupali between anandpur sahib and nangal dam. the proposed alignment passes through the shivalik, great himalayan & zanskar ranges, areas with wide variation in height (600 mtrs to 5,300 mtrs above msl) and seismic zone iv and v [is:1893(part-i)-2002], necessitating building of large number of tunnels, deep viaducts & bridges. the work of final location survey has been entrusted by ministry of railways to rites and is planned to be completed by march 2019 with an approximate cost of rs. 1,570 million. [info as of: jun. 17]

, Jammu and Kashmir

Project ID: 2859

Amount(Approx):

Read More

Planning Stage

Indian Railways Organisation For Alternate Fuels

promoter name: indian railways organisation for alternate fuels project name: roof-top solar pv power plant in dist. patiala, punjab project type : new unit status : planning stage state : punjab district : patiala product-capacity : electricity - (2-mw ) associated company : appointed - bharat heavy electricals limited - contractor civil work: unknown current status : as of april 2017, bharat heavy electricals has bagged on order for 2 mwp roof top spv systems to be installed at diesel locomotive modernisation works (dmw), dist. patiala and the contract agreement was signed between the iroaf of indian railways and bharat heavy electricals for constructing a power plant at a record low cost of rs. 35.8 million per mwp (megawatt peak) under government of indias incentive scheme. the contract envisages design, supply, installation, testing and commissioning of grid connected roof top solar photo voltaic power plant with all electrical and associated equipment including civil works. it also includes operations and maintenance for 5 years. the plant will be commissioned within next 10 months. start date : unknown end date : unknown

, Punjab

Project ID: 2037

Amount(Approx):

Read More

Planning Stage

Indian Railways

indian railways is constructing a traction alternator factory (taf) in dist. vidisha, madhya pradesh. rites, gurgaon, is the consultant. this project is sanctioned in works programme of the ministry of railways at a cost of rs. 600 million. the factory will manufacture 100 units/ yr traction alternator & overhaul of 600 units/ yr traction motors for high horsepower diesel locomotives in-house, which are presently being imported. the traction alternators planned to be manufactured are highly complex machines and would be used in 4500 hp diesel electric locomotives. the indian railways (ir) need about 100 traction alternators motors in a year and most of these are being imported at present. similarly, the requirement of traction motors overhaul for indian railways is about 600 per annum, which is presently being outsourced. foundation stone was laid on 26th may, 2015. civil work is in progress and the project is scheduled for completion in 2017. [info as of: jun. 15]

, Madhya Pradesh

Project ID: 1088

Amount(Approx):

Read More

Under Implementation

PROJECTS BY LOCATIONS

PROJECT INFORMATION

Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website.