providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of eic. 50 to 100 mm average compacted thickness with bitumen of grade vg30, 3.50 percent (percentage by weight of total mix) prepared in batch type hot mix plant of 100 to 120 tph capacity.