towards execution of work like scarifying the existing bituminous road surface to a depth of 50 mm, earthwork in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width, laying dense graded bituminous, etc. as mentioned in boq.
Not a Member? Create an Account