civil works
sec.1.0 earth work
providing material, labour, machinery for excavation of foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff with in/ out side the campus upto 1.0 km lead, all lift/ depth including back filling the trenches, sides of foundations, plot filling, plinth filling with excavted material (excluding hard rock and black cotton soil) anywhere from the site/ campus etc complete as directed by engineer in charge.
- any type of soil or rock not requiring blasting.