the work of increasing capacity of 11/0.4 kv sub-stations from 100/250 kva t/f to 250/400 kva distribution transformer, construction of plinth & pale fencing for 250/400 kva t/fs and installation of the same on the double pole structure/plinths at-mohalla- khai par/ babulal vidhayak wali gali jaraili kothi, near kiran collage, kalu kuwan near bank of baroda, sahyog ashram indra nagar, near post office, shanti nagar near hl inter collage etc. under business plan scheme 2023-24 under eudd, banda, including carriage of all required material/transformers from esc/workshop banda to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/scraped/dismentled t/fs from site to store centre/workshop, if any. all the material (like angle, pale fencing, steel section, paint, etc.) to be used during the work will have to be arranged by the contractor/executive agency at his own cost. details of the work as given below ;-