the work of increasing capacity of 11/0.4 kv sub-stations from 100/250 kva t/f to 250/400 kva distribution transformer, construction of plinth & pale fencing for 250/400 kva t/fs and installation of the same on the double pole structure/plinths at-mohalla- sankat mochan mandir/swaraj colony near jainarayan mishra home/civil line near vivek singh/maeadan naka b.s.n.l tower/ babulal vidhayak wali gali jaraili kothi/sukul kuwan chilla road/sukul kuwan baba talab etc. under business plan scheme 2023-24 under eudd, banda, including carriage of all required material/transformers from esc/workshop banda to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/scraped/dismentled t/fs from site to store centre/workshop, if any. all the material (like angle, pale fencing, steel section, paint, etc.) to be used during the work will have to be arranged by the contractor/executive agency at his own cost. details of the work as given below ;-