providing and installing deep tubewell 200 mm i/d straight 170 mtr depth with 15 mtr stainless strainer with reverse rotary rig,depth 170 mtr, pumping machinery, chlorinator, construction pump chamber with wc and gravel pit, construction of one no. over head storage reservoir 50 k - corrigendum.