tangedco mtps-ii - installation of wet lime stone based flue gas desulphurization system inclusive of design, engineering, manufacture, procurement, inspection/ testing at manufacturers works, supply, packing, delivery at site, fabrication, erection, interconnection with the existing units, pre-commissioning, testing, commissioning of the system including associated civil works, complete electrical and candi systems on turnkey basis and performance testing along with all auxiliaries and accessories, supply of special tools and tackles and mandatory spares in order to reduce the sox emission to comply the new environmental norms for 1x600mw unit of mettur thermal power station ii under single epc basis. .