design and construction of retrofitting work of water supply schmes under jal jivan mission, including construction of rcc sump well, rcc over head tank, providing and installation of pumps at under ground sources and sump, providing, laying and jointing of pumpingmain and distribution pipe lines, household tap connections and electric power connections including, cost of all material and labour along with 90days successful trial run of entire schemes