providing electrical works including shifting of all electrical lt ug cables panel boards from existing old switch room and to provide electrical connections including supplying and laying of new lt ug cables /supplying and fixing of mccb,s/mcb,s,/bus bar providing cable jointing kits etc.. supplying and installation of new panel board at the back side of the old hvac plant.