package-iii construction of fic to po no22.23.24.25 @ch 25m l/s, 475m l/s, 50m r/s, and 375m r/s of sub-minor no 7 and po no 26.27 @ch 25m l/s and 50m r/s of sub-minor no 8 of minor no3 under csd of nbc.,po no 8and 9 @ch 25m l/s, and 50m r/s of sub-minor no 3 of minor no3 under csd of nbc and dpo no11 @ch. 8600m r/s of csd under csd., construction of fic to sub-minor no.2 offtake @ch.2100m of minor no14 for po no1,2,3and 4 @ch 120m l/s, 130m r/s, 400m l/s, and 400m r/s under csd of nbc., construction of fic to po no.1,2,3and 4 @ch 10m r/s, 350m r/s, 700m l/s and 700m r/s of minor no1 under d-19 of nbc., construction of fic to po no.1,2,3and 4 @ch 30m l/s, 300m l/s, 450m l/s and 700m l/s of minor no2 and po no 1,2,3 and 4 @ch.5m l/s, 5m r/s, 210m l/s, and 280m r/s of minor no3 under d-19 of nbc., construction of fic to dpo no.2,3and 4 @ch 1680m l/s, 2370m l/s, 2370m r/s under d-19 of nbc.