part-a (11 kv ht line & l.t. sub station)
supply and errection of 11 meter long tubler pole sp 55, 1/6 over all length of pole grouted in cement concrete with 1:3:6 (cement concrete) of pole 30cm above the ground levels including excavation, back filling etc. rates includes all materials, labour, t&p etc. required for proper completion of the work as per e/i . ar/2018