ultratech cement limited×

Projects

UltraTech Cement Limited

expansion in granted capacity 3.3 to 5.77 mtpa rom (limestone 5.25 mtpa & mineral reject 0.52 mtpa), top soil 0.001 mtpa, ob 3.08 mtpa, (total excavation 8.851 mtpa) & proposed crusher 1500tph with wobbler (ml no. 29/99, ml area: 689.76 ha)

Pali , Rajasthan

Project ID: 4496

Amount(Approx): 115 Cr

Read More

Expansion

UltraTech Cement Limited

expansion of integrated cement plant - clinker (2.0 to 3.5 mtpa), cement (0.5 to 3.5 mtpa), cpp (27 to 30 mw) along with installation of whrs (13 mw) at village: dalla (kota), tehsil: robertsganj,

Sonbhadra, Uttar Pradesh

Project ID: 3818

Amount(Approx): 21000 Lacs

Read More

Expansion

UltraTech Cement Limited

deora, sitapuri & udiyapura limestone auction block with ml area - 344.783 ha with limestone production capacity - 2.0 million tpa, top soil - 0.17 million tpa, ob & ib - 0.25 million tpa (total excavation - 2.42 million tpa) at villages: deora, sitapuri, udiyapura and muhali, tehsil: manawar

Dhar, Madhya Pradesh

Project ID: 3808

Amount(Approx): 4705 Lacs

Read More

New

Ultratech Cement Limited

ultratech cement proposes an expansion of its cement grinding unit at villages shahjhanpur, maksudpur and hurari, dist. patna, bihar from 2 mtpa to 4 mtpa. the estimated cost of the project is rs. 1,682.5 million. the current status of the project could not be ascertained. according to moef sources, total land area of existing grinding unit is 125 acres. the expansion of cement grinding unit will be within the existing plant premises. the project will be completed in 22 months period after getting all the regulatory approvals. [info as of: mar. 17]

Villages Shahjhanpur, Maksudpur and Hurari, Bihar

Project ID: 2109

Amount(Approx): Estimated Cost: Rs. 1,682.5 million

Read More

Unknown / Could not be ascertained

Ultratech Cement Limited

ultratech cement is planning a 3.5 mtpa greenfield integrated cement plant in dist. dhar, madhya pradesh. the estimated cost of the project is rs. 26,000 million. the project has been approved by the companys board on 21st january, 2017. commercial production of the new plant is expected to start in q4 fy19. with this expansion and the acquisition of the cement plants of jaiprakash associates, the companys cement capacity will stand augmented to 95 mtpa including its overseas operations. [info as of: jan. 17]

, Madhya Pradesh

Project ID: 1445

Amount(Approx): Estimated Cost: Rs. 26,000 million

Read More

Planning Stage

Ultratech Cement Limited

ultratech cement, a flagship company of the aditya birla group, proposes an expansion of the aditya limestone mining project at tehsil chittorgarh and nimbahera, dist. chittorgarh, rajasthan from 10.0 mtpa to 13.17 mtpa. the current status of the project could not be ascertained. according to moef sources, mining lease area is 760.692 hectares. the company has its existing integrated cement plant and has proposed enhancement in clinker production capacity from 8.4 mtpa to 8.9 mtpa by process optimization at village sawa shambupura, dist. chittorgarh. in order to meet the limestone requirement, the company has proposed expansion in the aditya limestone mine. power requirement for limestone mine will be 13.0 mw which will be sourced from captive thermal power plant and state electricity board/ grid. mining operation is being/ will be carried out by fully mechanized opencast method. [info as of: dec. 16]

Tehsil Chittorgarh And Nimbahera, Rajasthan

Project ID: 1061

Amount(Approx):

Read More

Unknown / Could not be ascertained

Ultratech Cement Limited

ultratech cement proposes the 2.0 mtpa mahua cement project at villages kotra and bhatakda, dist. bhavnagar, gujarat on 127 hectares. the current status of the project could not be ascertained. according to moef sources, the estimated cost of the project is rs. 10,000 million. r.k consultants, jodhpur is the consultant. land has been purchased. limestone will be sourced from nearby proposed captive limestone bearing area of the company. power required will be sourced from state electricity board. water required will be sourced from the de-salination plant to be installed by the company. [info as of: sept. 16]

Villages Kotra And Bhatakda, Gujarat

Project ID: 390

Amount(Approx): Estimated Cost: Rs. 10,000 million

Read More

Unknown / Could not be ascertained

PROJECTS BY LOCATIONS

PROJECT INFORMATION

Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website. Get All The Latest All Tender/Project/Result Information From Across India. Search Road Tenders Tenders From Live And Archive Business Category. All Tenders Are Updated On Daily Basis On Our Website.