adveta power, a joint venture company of panacea biotech, is planning the 3x26.67 mw chomi hydroelectric project on river kurung, dist. kurung kumey, arunachal pradesh. consultant is appointed. the project is waiting for environmental clearance. work on the project is expected to commence after receipt of environmental clearance. according to moef sources, the project has been planned as run-of-the-river (ror) project. the company has entered into moa with the government of arunachal pradesh for development of the project. the estimated cost of the project is rs. 5,530.8 million. a switchyard adjacent to surface powerhouse shall be provided to evacuate power at 132 kv voltage level by constructing 5 km long 132 kv d/c transmission to the proposed pgcil sub-station at koloiang. the project is planned for commissioning in 7 years. [info as of: oct. 16]