Explore our Product/Service and Discover Exclusive Tender Opportunities

Showing results 10 in 20k+ tenders list

  • Location: Ankola, Karnataka

  • Last Date: 11 Jul 2024

  • Amount: 9.46 Lac

Ref. No: 41229274

Ref. No: 37734476

Ref. No: 36716734

Ref. No: 36579389

  • Location: Ankola, Karnataka

  • Last Date: 09 Dec 2023

  • Amount: Ref. Doc.

Ref. No: 36517909

Ref. No: 36517838

  • Location: Ankola, Karnataka

  • Last Date: 14 Dec 2023

  • Amount: Ref. Doc.

Ref. No: 36517837

Ref. No: 36517825

Ref. No: 29935558

Ref. No: 29935558

Ref. No: 29921169

Ref. No: 29921169

KARNATAKA POWER CORPORATION LIMITED

Contractor Shall Deploy The Experienced License Holding Drivers As Per Scope Of Work And Preference Will Be Given To Sslc Passed And Minimum Two Years Or More Experience In Heavy Vehicle (Such As Bus Lorry Etc.) Driving. 2. The Successful Agency Shall Deploy The Drivers As Per Contract Within 7 Days From The Date Of Receipt Of Work Order 3.The Drivers Shall Be Deployed For Daily Duties Of 12 Hours For Rendering The Services. 4. The Drivers Personnel Deployed Shall Be Discipline Physically Fit And Mentally Alert. 5. Halting: If The Vehicle Travels Outstation And Halts Outstation Then Halting Charge Is Applicable. General Scope Of Work: 1. The Drivers Shall Be Deployed To Other Sections Of The Division Depending On Requirement. 2. In Case Of Emergency Requirement The Drivers May Have To Work Beyond General Duty Hours Or May Be Called For Duty After The General Duty Hours. 3. In The Event Of Occurrence Of Any Accidents At/Near The Site Of Work Or In Connection With Execution Of The Work A Report Shall Be Submitted By The Agency Immediately To The Concerned Engineer Giving Full Details Of The Accident. 4. Instruction May Be Issued From Time To Time During Progress Of The Work For Removal And Re Execution Of Any Work Which Is Not In Line With The Required Specification In The Opinion Of The Engineer. 5. The Corporation Shall Not Be Responsible For Any Of The Unauthorized Acts And Or Liable For Any Damage Or Injury Sustained By Agency In The Course Of Their Work Duty In And Around The Office And Plant Premises. 6. The Agency Shall Maintain Proper Records And Present To The Concerned Officers Whenever Called For. 7. The Work Is Of Time Bound Nature And Hence The Agency Shall Attend The Work Immediately On Intimation By The Executing Division And Complete The Work Within The Scheduled Time. Other Terms And Conditions: 1. The Agencies Shall Visit Work Site Before Quoting In Order To Have First-Hand Information About The Working Conditions At Site. 2. The Agencies Shall Deploy The Qualified Drivers As Required. One Of Them Must Take The Responsibility Of Leader Of This Unit. 3. The Contractor Shall Protect His Deployed Employees And Other Persons From Risk Of Injury Or Bodily Harm Arising From Or In Any Way Related To The Work. 4. The Transportation Arrangements Of Drivers Are The Responsibility Of The Contractor Himself. 5. The Agency Should Have Provident Fund Account For All His Drivers And Should Submit Pf Paid Statement Whenever Asked By Engineer -In-Charge. 6. Workmen Compensation Insurance Shall Be Made By The Agency For The Deployed Labour As Per Workmen Compensation Act-1948, Which Shall Also Cover The Contractor Against Claims For Injury Disability Disease Or Death Of His Or His Sub-Contractor Employees. 7. The Drivers Called For Duties Beyond Or After General Duty Hours Are Not Eligible For Any Extra Holidays From Kpcl. 8. All Contractor Workers Should Wear Uniforms Belts And Shoes And Id Cards While Driving.

  • Location: Ankola, Karnataka

  • Last Date: 21 Feb 2023

  • Amount: 6.30 Lac

Ref. No: 29697494

KARNATAKA POWER CORPORATION LIMITED

Contractor Shall Deploy The Experienced License Holding Drivers As Per Scope Of Work And Preference Will Be Given To Sslc Passed And Minimum Two Years Or More Experience In Heavy Vehicle (Such As Bus Lorry Etc.) Driving. 2. The Successful Agency Shall Deploy The Drivers As Per Contract Within 7 Days From The Date Of Receipt Of Work Order 3.The Drivers Shall Be Deployed For Daily Duties Of 12 Hours For Rendering The Services. 4. The Drivers Personnel Deployed Shall Be Discipline Physically Fit And Mentally Alert. 5. Halting: If The Vehicle Travels Outstation And Halts Outstation Then Halting Charge Is Applicable. General Scope Of Work: 1. The Drivers Shall Be Deployed To Other Sections Of The Division Depending On Requirement. 2. In Case Of Emergency Requirement The Drivers May Have To Work Beyond General Duty Hours Or May Be Called For Duty After The General Duty Hours. 3. In The Event Of Occurrence Of Any Accidents At/Near The Site Of Work Or In Connection With Execution Of The Work A Report Shall Be Submitted By The Agency Immediately To The Concerned Engineer Giving Full Details Of The Accident. 4. Instruction May Be Issued From Time To Time During Progress Of The Work For Removal And Re Execution Of Any Work Which Is Not In Line With The Required Specification In The Opinion Of The Engineer. 5. The Corporation Shall Not Be Responsible For Any Of The Unauthorized Acts And Or Liable For Any Damage Or Injury Sustained By Agency In The Course Of Their Work Duty In And Around The Office And Plant Premises. 6. The Agency Shall Maintain Proper Records And Present To The Concerned Officers Whenever Called For. 7. The Work Is Of Time Bound Nature And Hence The Agency Shall Attend The Work Immediately On Intimation By The Executing Division And Complete The Work Within The Scheduled Time. Other Terms And Conditions: 1. The Agencies Shall Visit Work Site Before Quoting In Order To Have First-Hand Information About The Working Conditions At Site. 2. The Agencies Shall Deploy The Qualified Drivers As Required. One Of Them Must Take The Responsibility Of Leader Of This Unit. 3. The Contractor Shall Protect His Deployed Employees And Other Persons From Risk Of Injury Or Bodily Harm Arising From Or In Any Way Related To The Work. 4. The Transportation Arrangements Of Drivers Are The Responsibility Of The Contractor Himself. 5. The Agency Should Have Provident Fund Account For All His Drivers And Should Submit Pf Paid Statement Whenever Asked By Engineer -In-Charge. 6. Workmen Compensation Insurance Shall Be Made By The Agency For The Deployed Labour As Per Workmen Compensation Act-1948, Which Shall Also Cover The Contractor Against Claims For Injury Disability Disease Or Death Of His Or His Sub-Contractor Employees. 7. The Drivers Called For Duties Beyond Or After General Duty Hours Are Not Eligible For Any Extra Holidays From Kpcl. 8. All Contractor Workers Should Wear Uniforms Belts And Shoes And Id Cards While Driving.

  • Location: Ankola, Karnataka

  • Last Date: 21 Feb 2023

  • Amount: 6.30 Lac

Ref. No: 29697494

KARNATAKA POWER CORPORATION LIMITED

Contractor Shall Deploy The Experienced License Holding Drivers As Per Scope Of Work And Preference Will Be Given To Sslc Passed And Minimum Two Years Or More Experience In Heavy Vehicle (Such As Bus Lorry Etc.) Driving. 2. The Successful Agency Shall Deploy The Drivers As Per Contract Within 7 Days From The Date Of Receipt Of Work Order 3.The Drivers Shall Be Deployed For Daily Duties Of 12 Hours For Rendering The Services. 4. The Drivers Personnel Deployed Shall Be Discipline Physically Fit And Mentally Alert. 5. Halting: If The Vehicle Travels Outstation And Halts Outstation Then Halting Charge Is Applicable. General Scope Of Work: 1. The Drivers Shall Be Deployed To Other Sections Of The Division Depending On Requirement. 2. In Case Of Emergency Requirement The Drivers May Have To Work Beyond General Duty Hours Or May Be Called For Duty After The General Duty Hours. 3. In The Event Of Occurrence Of Any Accidents At/Near The Site Of Work Or In Connection With Execution Of The Work A Report Shall Be Submitted By The Agency Immediately To The Concerned Engineer Giving Full Details Of The Accident. 4. Instruction May Be Issued From Time To Time During Progress Of The Work For Removal And Re Execution Of Any Work Which Is Not In Line With The Required Specification In The Opinion Of The Engineer. 5. The Corporation Shall Not Be Responsible For Any Of The Unauthorized Acts And Or Liable For Any Damage Or Injury Sustained By Agency In The Course Of Their Work Duty In And Around The Office And Plant Premises. 6. The Agency Shall Maintain Proper Records And Present To The Concerned Officers Whenever Called For. 7. The Work Is Of Time Bound Nature And Hence The Agency Shall Attend The Work Immediately On Intimation By The Executing Division And Complete The Work Within The Scheduled Time. Other Terms And Conditions: 1. The Agencies Shall Visit Work Site Before Quoting In Order To Have First-Hand Information About The Working Conditions At Site. 2. The Agencies Shall Deploy The Qualified Drivers As Required. One Of Them Must Take The Responsibility Of Leader Of This Unit. 3. The Contractor Shall Protect His Deployed Employees And Other Persons From Risk Of Injury Or Bodily Harm Arising From Or In Any Way Related To The Work. 4. The Transportation Arrangements Of Drivers Are The Responsibility Of The Contractor Himself. 5. The Agency Should Have Provident Fund Account For All His Drivers And Should Submit Pf Paid Statement Whenever Asked By Engineer -In-Charge. 6. Workmen Compensation Insurance Shall Be Made By The Agency For The Deployed Labour As Per Workmen Compensation Act-1948, Which Shall Also Cover The Contractor Against Claims For Injury Disability Disease Or Death Of His Or His Sub-Contractor Employees. 7. The Drivers Called For Duties Beyond Or After General Duty Hours Are Not Eligible For Any Extra Holidays From Kpcl. 8. All Contractor Workers Should Wear Uniforms Belts And Shoes And Id Cards While Driving.

  • Location: Ankola, Karnataka

  • Last Date: 21 Feb 2023

  • Amount: 6.30 Lac

Ref. No: 29696050

KARNATAKA POWER CORPORATION LIMITED

Contractor Shall Deploy The Experienced License Holding Drivers As Per Scope Of Work And Preference Will Be Given To Sslc Passed And Minimum Two Years Or More Experience In Heavy Vehicle (Such As Bus Lorry Etc.) Driving. 2. The Successful Agency Shall Deploy The Drivers As Per Contract Within 7 Days From The Date Of Receipt Of Work Order 3.The Drivers Shall Be Deployed For Daily Duties Of 12 Hours For Rendering The Services. 4. The Drivers Personnel Deployed Shall Be Discipline Physically Fit And Mentally Alert. 5. Halting: If The Vehicle Travels Outstation And Halts Outstation Then Halting Charge Is Applicable. General Scope Of Work: 1. The Drivers Shall Be Deployed To Other Sections Of The Division Depending On Requirement. 2. In Case Of Emergency Requirement The Drivers May Have To Work Beyond General Duty Hours Or May Be Called For Duty After The General Duty Hours. 3. In The Event Of Occurrence Of Any Accidents At/Near The Site Of Work Or In Connection With Execution Of The Work A Report Shall Be Submitted By The Agency Immediately To The Concerned Engineer Giving Full Details Of The Accident. 4. Instruction May Be Issued From Time To Time During Progress Of The Work For Removal And Re Execution Of Any Work Which Is Not In Line With The Required Specification In The Opinion Of The Engineer. 5. The Corporation Shall Not Be Responsible For Any Of The Unauthorized Acts And Or Liable For Any Damage Or Injury Sustained By Agency In The Course Of Their Work Duty In And Around The Office And Plant Premises. 6. The Agency Shall Maintain Proper Records And Present To The Concerned Officers Whenever Called For. 7. The Work Is Of Time Bound Nature And Hence The Agency Shall Attend The Work Immediately On Intimation By The Executing Division And Complete The Work Within The Scheduled Time. Other Terms And Conditions: 1. The Agencies Shall Visit Work Site Before Quoting In Order To Have First-Hand Information About The Working Conditions At Site. 2. The Agencies Shall Deploy The Qualified Drivers As Required. One Of Them Must Take The Responsibility Of Leader Of This Unit. 3. The Contractor Shall Protect His Deployed Employees And Other Persons From Risk Of Injury Or Bodily Harm Arising From Or In Any Way Related To The Work. 4. The Transportation Arrangements Of Drivers Are The Responsibility Of The Contractor Himself. 5. The Agency Should Have Provident Fund Account For All His Drivers And Should Submit Pf Paid Statement Whenever Asked By Engineer -In-Charge. 6. Workmen Compensation Insurance Shall Be Made By The Agency For The Deployed Labour As Per Workmen Compensation Act-1948, Which Shall Also Cover The Contractor Against Claims For Injury Disability Disease Or Death Of His Or His Sub-Contractor Employees. 7. The Drivers Called For Duties Beyond Or After General Duty Hours Are Not Eligible For Any Extra Holidays From Kpcl. 8. All Contractor Workers Should Wear Uniforms Belts And Shoes And Id Cards While Driving.

  • Location: Ankola, Karnataka

  • Last Date: 21 Feb 2023

  • Amount: 6.30 Lac

Ref. No: 29696050

KARNATAKA POWER CORPORATION LIMITED

1.Operation Of Stoplog: Lowering Lifting And Proper Stacking Of Seven Crest Stoplog Elements By Operating Gantry Carne And Sealing. 2. Dismantling Work: Dismantling Of All Existing Rubber Seals By Lifting Of Radial Gate Keeping On The Temporary Platform For Level Keeping Right Angle Checking And Etc. Dismantling Of Corroded Skin Plate Vertical Girders T Girder Pulleys Shaft Wire Rope Pulley Support And Other Associated Parts Etc Complete Including Scaffolding Cutting Gas All Tools And Tackles Gas Labour Etc. Lifting Of All Removed Steel To The Top Of Dam.10.85Mt.3. Design Fabrication Supply Erection Testing And Commissioning Of Radial Gate Consisting Of Skin Plate Stiffeners Horizontal Girders Pulley Supports Bracings Rubber Seals Clamps Etc., With All Accessories For Spillway Including Cost Of All Materials Machinery Labour Cutting Bending Aligning Anchoring Welding Finishing Cleaning Applying One Coat Of Zinc Rich Epoxy Primer And Three Coats Of Cold Applied Coal Tar Epoxy Paint Seal Fixing Etc. 4.Fabrication And Erection: Cutting Drilling Bending Machining V Cutting Machining Drilling Hole To Skin Plate For Rubber Seal Fixing Complete Welding By Following Standard Practices By Using Elctrode 7018 With Preheating Facility Transportation Loading Unloading Etc,. Dpt Test Of Important Welding Joints As Directed By Kpcl. Fixing Of Skin Plate T Girder Vertical Girder Existing Pulley And Supports Stiffeners Pulley Bracket Pulley Shaft And Roller Bracket Etc. Including Welding Grinding And Machining Labour Tools And Tackles Required Gas Set Electrode Winch Welding Set Cutting Set And All Tools And Transportation If Required Etc, Complete.-10.97Mt. Steel Consumption Will Be Considered As Per Actual Quantity Utilized Repair Works. 5.Chipping Of Concrete Around Yoke Girder By Using Heavy Drilling Machine. The Drilling Machines Shall Be Provided By The Agency. 6.Overhauling Of Hoist Unit: Complete Overhauling Of Hoist Units Which Includes Lubrication Replacement Of Gear Oil, Motor Maintenance Like Megger, Checking Of Connections Hoist Unit Painting Replacement Of Hoist Unit Coupling Fasteners, Manual Operation Setting Limits Switch Supply And Setting, Wiring And Setting Upper Pulley Servicing Position Indicator Chain And Sprocket Setting And Ensure Full Condition Of Operation. 7.Commissioning And Testing Of Radial Gate: Lifting After Attending The Work And Checking Of Radial Gate Operation Before Fixing Of Seal To The Height Of 9.60 Meter Inspection And Setting Of Balance Of Gates By Operating Several Times Till Ensuring Of Full Operational Condition. Providing Temporary Platform, Fixing Of New Rubber Seal. Trail Operation To The Full Height 9.60 Mtr After Fixing Of Rubber Seal. 8.Structural Steel: The Area Of Replacement Of Structural Steel Of Radial Gate Is Considered On Visual Inspection While Preparing The Estimation However The Area Of Replacement Of Steel Is To Be Considered Based On Actual Damage Of Gates And Has To Be Attended Accordingly As Per The Direction Of Engineer In Charge. Total Quantity Of Structural Is To Be Replaced Is 10.85Mt Wastage Is In The Scope Of Agency. Replacement And Resetting Of Trunion Foundation Bolts, Chipping Of Concrete Around Yoke Girders Of 0.5 Cum And Plastering Around Such A Way That Yoke Girder Shall Have Free Movement Is Included In Scope Of Work.9.Supply And Transportation Of Steel-10.97 Mt (Excluding Wastage) First Quality Confirming Is 226 Or 2062 Make-Sail/Tata/Jsw Or Equivalent Along With Test Certificate, 2 Side Rubber Seal 1 Bottom Rubber Seal M16X75Mm Full Thread Bolt Nut Along With Washer-415 Nos M28X200 Full Thread Ht Bolt Nut Along With Double Washer-32 Nos To Bommanhalli Pick Up Dam Site.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 29.59 Lac

Ref. No: 29642174

KARNATAKA POWER CORPORATION LIMITED

1.Operation Of Stoplog: Lowering Lifting And Proper Stacking Of Seven Crest Stoplog Elements By Operating Gantry Carne And Sealing. 2. Dismantling Work: Dismantling Of All Existing Rubber Seals By Lifting Of Radial Gate Keeping On The Temporary Platform For Level Keeping Right Angle Checking And Etc. Dismantling Of Corroded Skin Plate Vertical Girders T Girder Pulleys Shaft Wire Rope Pulley Support And Other Associated Parts Etc Complete Including Scaffolding Cutting Gas All Tools And Tackles Gas Labour Etc. Lifting Of All Removed Steel To The Top Of Dam.10.85Mt.3. Design Fabrication Supply Erection Testing And Commissioning Of Radial Gate Consisting Of Skin Plate Stiffeners Horizontal Girders Pulley Supports Bracings Rubber Seals Clamps Etc., With All Accessories For Spillway Including Cost Of All Materials Machinery Labour Cutting Bending Aligning Anchoring Welding Finishing Cleaning Applying One Coat Of Zinc Rich Epoxy Primer And Three Coats Of Cold Applied Coal Tar Epoxy Paint Seal Fixing Etc. 4.Fabrication And Erection: Cutting Drilling Bending Machining V Cutting Machining Drilling Hole To Skin Plate For Rubber Seal Fixing Complete Welding By Following Standard Practices By Using Elctrode 7018 With Preheating Facility Transportation Loading Unloading Etc,. Dpt Test Of Important Welding Joints As Directed By Kpcl. Fixing Of Skin Plate T Girder Vertical Girder Existing Pulley And Supports Stiffeners Pulley Bracket Pulley Shaft And Roller Bracket Etc. Including Welding Grinding And Machining Labour Tools And Tackles Required Gas Set Electrode Winch Welding Set Cutting Set And All Tools And Transportation If Required Etc, Complete.-10.97Mt. Steel Consumption Will Be Considered As Per Actual Quantity Utilized Repair Works. 5.Chipping Of Concrete Around Yoke Girder By Using Heavy Drilling Machine. The Drilling Machines Shall Be Provided By The Agency. 6.Overhauling Of Hoist Unit: Complete Overhauling Of Hoist Units Which Includes Lubrication Replacement Of Gear Oil, Motor Maintenance Like Megger, Checking Of Connections Hoist Unit Painting Replacement Of Hoist Unit Coupling Fasteners, Manual Operation Setting Limits Switch Supply And Setting, Wiring And Setting Upper Pulley Servicing Position Indicator Chain And Sprocket Setting And Ensure Full Condition Of Operation. 7.Commissioning And Testing Of Radial Gate: Lifting After Attending The Work And Checking Of Radial Gate Operation Before Fixing Of Seal To The Height Of 9.60 Meter Inspection And Setting Of Balance Of Gates By Operating Several Times Till Ensuring Of Full Operational Condition. Providing Temporary Platform, Fixing Of New Rubber Seal. Trail Operation To The Full Height 9.60 Mtr After Fixing Of Rubber Seal. 8.Structural Steel: The Area Of Replacement Of Structural Steel Of Radial Gate Is Considered On Visual Inspection While Preparing The Estimation However The Area Of Replacement Of Steel Is To Be Considered Based On Actual Damage Of Gates And Has To Be Attended Accordingly As Per The Direction Of Engineer In Charge. Total Quantity Of Structural Is To Be Replaced Is 10.85Mt Wastage Is In The Scope Of Agency. Replacement And Resetting Of Trunion Foundation Bolts, Chipping Of Concrete Around Yoke Girders Of 0.5 Cum And Plastering Around Such A Way That Yoke Girder Shall Have Free Movement Is Included In Scope Of Work.9.Supply And Transportation Of Steel-10.97 Mt (Excluding Wastage) First Quality Confirming Is 226 Or 2062 Make-Sail/Tata/Jsw Or Equivalent Along With Test Certificate, 2 Side Rubber Seal 1 Bottom Rubber Seal M16X75Mm Full Thread Bolt Nut Along With Washer-415 Nos M28X200 Full Thread Ht Bolt Nut Along With Double Washer-32 Nos To Bommanhalli Pick Up Dam Site.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 29.59 Lac

Ref. No: 29642174

KARNATAKA POWER CORPORATION LIMITED

Lifting Beam Rectification: Shaft Alignment Replacement Of 12Mm Pin Plate, Removing And Welding Of 2Nos New Pulley Shaft Support Plate. Lifting Beam Pulley Servicing And Making Free Rotation-1Nos. Rectification Of Roller: Roller Washer Plate Cutting -2 Sides And Fixing Of Total 16 Nos Of Roller Washer Dia 200Mm 8Mm Thick. -16Nos. Removing Of Rollers, Roller Cover Plate 2 Side Drilling And Tapping Of 12 Nos Of Counter Sunk Bolt For One Roller -8 Nos. Supply And Fixing Of Suitable M10 Counter Sunk Bolt For Roller Cover Plate.-96Nos. Roller And Pin Cleaning For Lubrication, Bearing Removing And Fixing Of New Bearing Of Size Id=100Mm, Od=180Mm Width=60Mm(Approximately)- 8Nos. Supply New Bearing Id=100Mm Od=180Mm Width 60Mm (The Size Of Bearing Mentioned Nearest Size The Exact Size Has To Be Considered After Dismantling Of Roller)-8 Nos. Removing Of Rubber Seal Bolt Cutting And Removing Of Seal Seal Clamp Fabrication-Side Top And Bottom - M12X80-160Nos. - Ls. Supply And Fixing Of New Two Side Rubber Seal 45Bulb 14Mm Thick And Total Length 6.6 Mtr, (Including All Materials And Consumable)-6.6 Mtr. Supply And Fixing Of New Corner Rubber Seal 300X300Mm 45Bulb And 14Mm Thick Left And Right Side (Including All Materials And Consumable)-2Nos. Supply And Fixing Of New Bottom Flat Seal 100Mm Width 20Mm Thick. -3.4 Mtr. Supply And Fixing Of New M12X80 Bolt And Nut With Double Washer-160Nos And Tightening. Supply And Fixing Of 4 Nos Guide Shoes Along With 4 Heavy Duty Springs And 4 M16X100Mm Bolt With 16 Nut With Washer For Each Guide Shoe Assembly. Total Bolts=16 Nos And 64 Nuts With Washer. Supply Of Ci Counter Weight Blocks Of Size 300X100X50Mm.).-2000Kg. Removing Of Entire Counter Weight Blocks And Balancing Of Counter Weight The Weights Should Be Equally Distributed All Along The Gate And Locking. Attending Structural Repairs At Gate Joint Plate, Counter Weight Lock Plate, Gate Stiffeners And End Girder Including Gas Cutting, Welding Etc., (Including All Materials And Consumable)-2000Kg. Gate Touch Paint, Rubber Seal Clamp Plate With Coal Tar Epoxy Paint With Two Coat. Consumable, Tools And Tackles Required And Other Equipment Required Carrying Out Work In Safe Manner. A)Electricity Required To Execute The Work At Site Will Be Provided By Kpcl If Available. It Is Observed Frequent Interruption Of Kptcl Power Supply Because Of Difficult Area Which Has To Be Considered Before Quoting. B)Provision Of Safety Apparatus And Equipment. C)Accommodation Will Be Provided On Chargeable Basis In Ambikanagar Colony Depends On Availability. D)Transportation: All The Transportation Of Men And Material Is Included.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 15.81 Lac

Ref. No: 29642169

KARNATAKA POWER CORPORATION LIMITED

Lifting Beam Rectification: Shaft Alignment Replacement Of 12Mm Pin Plate, Removing And Welding Of 2Nos New Pulley Shaft Support Plate. Lifting Beam Pulley Servicing And Making Free Rotation-1Nos. Rectification Of Roller: Roller Washer Plate Cutting -2 Sides And Fixing Of Total 16 Nos Of Roller Washer Dia 200Mm 8Mm Thick. -16Nos. Removing Of Rollers, Roller Cover Plate 2 Side Drilling And Tapping Of 12 Nos Of Counter Sunk Bolt For One Roller -8 Nos. Supply And Fixing Of Suitable M10 Counter Sunk Bolt For Roller Cover Plate.-96Nos. Roller And Pin Cleaning For Lubrication, Bearing Removing And Fixing Of New Bearing Of Size Id=100Mm, Od=180Mm Width=60Mm(Approximately)- 8Nos. Supply New Bearing Id=100Mm Od=180Mm Width 60Mm (The Size Of Bearing Mentioned Nearest Size The Exact Size Has To Be Considered After Dismantling Of Roller)-8 Nos. Removing Of Rubber Seal Bolt Cutting And Removing Of Seal Seal Clamp Fabrication-Side Top And Bottom - M12X80-160Nos. - Ls. Supply And Fixing Of New Two Side Rubber Seal 45Bulb 14Mm Thick And Total Length 6.6 Mtr, (Including All Materials And Consumable)-6.6 Mtr. Supply And Fixing Of New Corner Rubber Seal 300X300Mm 45Bulb And 14Mm Thick Left And Right Side (Including All Materials And Consumable)-2Nos. Supply And Fixing Of New Bottom Flat Seal 100Mm Width 20Mm Thick. -3.4 Mtr. Supply And Fixing Of New M12X80 Bolt And Nut With Double Washer-160Nos And Tightening. Supply And Fixing Of 4 Nos Guide Shoes Along With 4 Heavy Duty Springs And 4 M16X100Mm Bolt With 16 Nut With Washer For Each Guide Shoe Assembly. Total Bolts=16 Nos And 64 Nuts With Washer. Supply Of Ci Counter Weight Blocks Of Size 300X100X50Mm.).-2000Kg. Removing Of Entire Counter Weight Blocks And Balancing Of Counter Weight The Weights Should Be Equally Distributed All Along The Gate And Locking. Attending Structural Repairs At Gate Joint Plate, Counter Weight Lock Plate, Gate Stiffeners And End Girder Including Gas Cutting, Welding Etc., (Including All Materials And Consumable)-2000Kg. Gate Touch Paint, Rubber Seal Clamp Plate With Coal Tar Epoxy Paint With Two Coat. Consumable, Tools And Tackles Required And Other Equipment Required Carrying Out Work In Safe Manner. A)Electricity Required To Execute The Work At Site Will Be Provided By Kpcl If Available. It Is Observed Frequent Interruption Of Kptcl Power Supply Because Of Difficult Area Which Has To Be Considered Before Quoting. B)Provision Of Safety Apparatus And Equipment. C)Accommodation Will Be Provided On Chargeable Basis In Ambikanagar Colony Depends On Availability. D)Transportation: All The Transportation Of Men And Material Is Included.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 15.81 Lac

Ref. No: 29642169

KARNATAKA POWER CORPORATION LIMITED

A. Providing Position Indicator At Kodasalli Dam Unit #1. 1. Dismantling The Existing Position Indicator Switch After Removing All The Electrical Connections To The Operating Panel. 2. Cleaning Or Modification Of Seating Location As Per Site Requirement. 3. Supply Of Newly Procured Position Indicator Assembly And All Its Accessories Such As Cams, Limit Switches, Water Resistant Covers, Connecting Wires Etc. Specification : German, Stromag Maschinen Fabrik Stromag Gmbh-4750, Unna Endschalter Reihe 100 Type: 16, Ne:651 Fv Aufter No-143 1840 230V Ac,6A,100V At Suitable Position And Connecting All Electrical Connection. 4.Installation Of Position Indicator Mechanism And Connecting It To The Operating Panel. 5.Commissioning Of The Switch Shall Be Carried Out As Per The Direction Of Engineer In-Charge. The Switch Shall Operate For The Following Position Of Gate. A) Fully Open B) Crack Open C) Fully Closed D)2 Intermediate Positions E)2 Spare Positions 6. Testing Of The Installed Switch Can Be Demonstrated As Per The Requirement. 7.Other Related Work Like Cleaning And Shifting Of Released Materials To Stores Etc As Per The Instruction Of Engineer In-Charge. B) Renovation Of Hydraulic Power Pack For Penstock Gate Of Unit #1 At Kadra. The Following Works Will Be Carried Out After Obtaining Lc(By Engineer In-Charge) On Unit From Ldc Bangalore. 1. Closing Of Penstock Gate Of Unit#1 To Release Holding Pressure In The System. 2. Replacement Of Power Pack Manifold Along With New Set Of Valves And Components. 3. Replacement Of Cylinder Manifold With New Set Of Components Of Manifold And Other Hydraulic Valves Fixed To The Cylinder Pipelines. 4.Replacement Of Hydraulic Pipelines With Suitable High Pressure Seamless Pipelines And All Hydraulic Hoses. 5.Replacement Of Conservative Tank Hoses With New Ones. 6.Servicing The Oil Tank By Cleaning With Gasoline, Painting Of External Surface And Installation Of External Component Like Oil Filter, Vent System, Replacement Of Gear Pumps, Replacing Window Gasket And Arresting Any External Leakage In Hydraulic System. 7.Testing Of Pressure Lines By Operating Penstock Gate. 8.Monitoring Pressure In The System By Observing The Variation Of Pressure In Pressure Gauges As Well As Position Of Penstock Gate Level Indicator.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 20.63 Lac

Ref. No: 29642167

KARNATAKA POWER CORPORATION LIMITED

A. Providing Position Indicator At Kodasalli Dam Unit #1. 1. Dismantling The Existing Position Indicator Switch After Removing All The Electrical Connections To The Operating Panel. 2. Cleaning Or Modification Of Seating Location As Per Site Requirement. 3. Supply Of Newly Procured Position Indicator Assembly And All Its Accessories Such As Cams, Limit Switches, Water Resistant Covers, Connecting Wires Etc. Specification : German, Stromag Maschinen Fabrik Stromag Gmbh-4750, Unna Endschalter Reihe 100 Type: 16, Ne:651 Fv Aufter No-143 1840 230V Ac,6A,100V At Suitable Position And Connecting All Electrical Connection. 4.Installation Of Position Indicator Mechanism And Connecting It To The Operating Panel. 5.Commissioning Of The Switch Shall Be Carried Out As Per The Direction Of Engineer In-Charge. The Switch Shall Operate For The Following Position Of Gate. A) Fully Open B) Crack Open C) Fully Closed D)2 Intermediate Positions E)2 Spare Positions 6. Testing Of The Installed Switch Can Be Demonstrated As Per The Requirement. 7.Other Related Work Like Cleaning And Shifting Of Released Materials To Stores Etc As Per The Instruction Of Engineer In-Charge. B) Renovation Of Hydraulic Power Pack For Penstock Gate Of Unit #1 At Kadra. The Following Works Will Be Carried Out After Obtaining Lc(By Engineer In-Charge) On Unit From Ldc Bangalore. 1. Closing Of Penstock Gate Of Unit#1 To Release Holding Pressure In The System. 2. Replacement Of Power Pack Manifold Along With New Set Of Valves And Components. 3. Replacement Of Cylinder Manifold With New Set Of Components Of Manifold And Other Hydraulic Valves Fixed To The Cylinder Pipelines. 4.Replacement Of Hydraulic Pipelines With Suitable High Pressure Seamless Pipelines And All Hydraulic Hoses. 5.Replacement Of Conservative Tank Hoses With New Ones. 6.Servicing The Oil Tank By Cleaning With Gasoline, Painting Of External Surface And Installation Of External Component Like Oil Filter, Vent System, Replacement Of Gear Pumps, Replacing Window Gasket And Arresting Any External Leakage In Hydraulic System. 7.Testing Of Pressure Lines By Operating Penstock Gate. 8.Monitoring Pressure In The System By Observing The Variation Of Pressure In Pressure Gauges As Well As Position Of Penstock Gate Level Indicator.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 20.63 Lac

Ref. No: 29642167

KARNATAKA POWER CORPORATION LIMITED

1.Dismantling Of Existing Structural Steel Including Dismembering Including T And P And Scaffolding Wherever Necessary Sorting The Dismantled Material Disposal Of Unserviceable Material And Stacking The Serviceable Material With All Lifts Complete As Per Specifications - 4.64Mt. 2.Fabrication Of Structural Steel Including Primer Painting Including Steel Transporting To Site Hoisting And Erecting Structural Steel Member Fabricated From Rolled Steel Sections Like Channels Angles Flat I-Sections Plates Rails Etc., As Per Drawing Including Coat Of All Materials Machinery Labour Operations Such As Cutting Bending Grinding Welding Etc., And Providing One Coat Of Zinc Chromate Red Oxide Primer After Scrapping And Cleaning The Surface Scaffolding Etc., - 5.59Mt. 3. Providing And Installing Pre Painted Galvalume Sheet. Sheet Shall Be 0.47 Mm +/ - 0.02 Tolerance Mm Zinc-Alu Alloy Coating Az 150 Gsm As Per Astm 1397/755 - 550 Mpa Steel Grade, 5-7 Microns Epoxy Primer On Both Side Of The Sheet And Polyester Top Coat 20-22 Microns Using Self Drilling / Self Tapping Screws Of 25 Mm Length. (Width Up To 500-600 Mm Only) -78.80 Sqm. 4.Providing Synthetic Enamel Paint Of 1St Quality Two Coats Including Supply Of Paint-35.64 Sqm. 5.Providing Cold Applied Coal Tar Epoxy Paint Two Coats Including Supply Of Paint -186.54 Sqm. 6.The Scope Inclusive Of Petty Civil Work Like Plastering If Required. 7.Inclusive Of Removal All The Consumables Tools And Plants. 8.The Sites Kodasalli Dam, Kadra Dam And Supa Dam Are Installed In Different Location. 9.The Sites Is Located Remotely All Transportation Of Material, Men Machine And Accommodation Is Inclusive. 10.Provision Of Safety Equipment And Apparatus Are Inclusive. 11.Electricity Required To Execute The Work At Site Will Be Provided By Kpcl At Free Of Cost If Available. It Is Observed Frequent Interruption Of Kptcl Power Supply Because Of Difficult Area Which Has To Be Considered Before Quoting.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 6.16 Lac

Ref. No: 29642162

KARNATAKA POWER CORPORATION LIMITED

1.Dismantling Of Existing Structural Steel Including Dismembering Including T And P And Scaffolding Wherever Necessary Sorting The Dismantled Material Disposal Of Unserviceable Material And Stacking The Serviceable Material With All Lifts Complete As Per Specifications - 4.64Mt. 2.Fabrication Of Structural Steel Including Primer Painting Including Steel Transporting To Site Hoisting And Erecting Structural Steel Member Fabricated From Rolled Steel Sections Like Channels Angles Flat I-Sections Plates Rails Etc., As Per Drawing Including Coat Of All Materials Machinery Labour Operations Such As Cutting Bending Grinding Welding Etc., And Providing One Coat Of Zinc Chromate Red Oxide Primer After Scrapping And Cleaning The Surface Scaffolding Etc., - 5.59Mt. 3. Providing And Installing Pre Painted Galvalume Sheet. Sheet Shall Be 0.47 Mm +/ - 0.02 Tolerance Mm Zinc-Alu Alloy Coating Az 150 Gsm As Per Astm 1397/755 - 550 Mpa Steel Grade, 5-7 Microns Epoxy Primer On Both Side Of The Sheet And Polyester Top Coat 20-22 Microns Using Self Drilling / Self Tapping Screws Of 25 Mm Length. (Width Up To 500-600 Mm Only) -78.80 Sqm. 4.Providing Synthetic Enamel Paint Of 1St Quality Two Coats Including Supply Of Paint-35.64 Sqm. 5.Providing Cold Applied Coal Tar Epoxy Paint Two Coats Including Supply Of Paint -186.54 Sqm. 6.The Scope Inclusive Of Petty Civil Work Like Plastering If Required. 7.Inclusive Of Removal All The Consumables Tools And Plants. 8.The Sites Kodasalli Dam, Kadra Dam And Supa Dam Are Installed In Different Location. 9.The Sites Is Located Remotely All Transportation Of Material, Men Machine And Accommodation Is Inclusive. 10.Provision Of Safety Equipment And Apparatus Are Inclusive. 11.Electricity Required To Execute The Work At Site Will Be Provided By Kpcl At Free Of Cost If Available. It Is Observed Frequent Interruption Of Kptcl Power Supply Because Of Difficult Area Which Has To Be Considered Before Quoting.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 6.16 Lac

Ref. No: 29642162

KARNATAKA POWER CORPORATION LIMITED

1.Operation Of Stoplog: Lowering Lifting And Proper Stacking Of Seven Crest Stoplog Elements By Operating Gantry Carne And Sealing. 2. Dismantling Work: Dismantling Of All Existing Rubber Seals By Lifting Of Radial Gate Keeping On The Temporary Platform For Level Keeping Right Angle Checking And Etc. Dismantling Of Corroded Skin Plate Vertical Girders T Girder Pulleys Shaft Wire Rope Pulley Support And Other Associated Parts Etc Complete Including Scaffolding Cutting Gas All Tools And Tackles Gas Labour Etc. Lifting Of All Removed Steel To The Top Of Dam.10.85Mt.3. Design Fabrication Supply Erection Testing And Commissioning Of Radial Gate Consisting Of Skin Plate Stiffeners Horizontal Girders Pulley Supports Bracings Rubber Seals Clamps Etc., With All Accessories For Spillway Including Cost Of All Materials Machinery Labour Cutting Bending Aligning Anchoring Welding Finishing Cleaning Applying One Coat Of Zinc Rich Epoxy Primer And Three Coats Of Cold Applied Coal Tar Epoxy Paint Seal Fixing Etc. 4.Fabrication And Erection: Cutting Drilling Bending Machining V Cutting Machining Drilling Hole To Skin Plate For Rubber Seal Fixing Complete Welding By Following Standard Practices By Using Elctrode 7018 With Preheating Facility Transportation Loading Unloading Etc,. Dpt Test Of Important Welding Joints As Directed By Kpcl. Fixing Of Skin Plate T Girder Vertical Girder Existing Pulley And Supports Stiffeners Pulley Bracket Pulley Shaft And Roller Bracket Etc. Including Welding Grinding And Machining Labour Tools And Tackles Required Gas Set Electrode Winch Welding Set Cutting Set And All Tools And Transportation If Required Etc, Complete.-10.97Mt. Steel Consumption Will Be Considered As Per Actual Quantity Utilized Repair Works. 5.Chipping Of Concrete Around Yoke Girder By Using Heavy Drilling Machine. The Drilling Machines Shall Be Provided By The Agency. 6.Overhauling Of Hoist Unit: Complete Overhauling Of Hoist Units Which Includes Lubrication Replacement Of Gear Oil, Motor Maintenance Like Megger, Checking Of Connections Hoist Unit Painting Replacement Of Hoist Unit Coupling Fasteners, Manual Operation Setting Limits Switch Supply And Setting, Wiring And Setting Upper Pulley Servicing Position Indicator Chain And Sprocket Setting And Ensure Full Condition Of Operation. 7.Commissioning And Testing Of Radial Gate: Lifting After Attending The Work And Checking Of Radial Gate Operation Before Fixing Of Seal To The Height Of 9.60 Meter Inspection And Setting Of Balance Of Gates By Operating Several Times Till Ensuring Of Full Operational Condition. Providing Temporary Platform, Fixing Of New Rubber Seal. Trail Operation To The Full Height 9.60 Mtr After Fixing Of Rubber Seal. 8.Structural Steel: The Area Of Replacement Of Structural Steel Of Radial Gate Is Considered On Visual Inspection While Preparing The Estimation However The Area Of Replacement Of Steel Is To Be Considered Based On Actual Damage Of Gates And Has To Be Attended Accordingly As Per The Direction Of Engineer In Charge. Total Quantity Of Structural Is To Be Replaced Is 10.85Mt Wastage Is In The Scope Of Agency. Replacement And Resetting Of Trunion Foundation Bolts, Chipping Of Concrete Around Yoke Girders Of 0.5 Cum And Plastering Around Such A Way That Yoke Girder Shall Have Free Movement Is Included In Scope Of Work.9.Supply And Transportation Of Steel-10.97 Mt (Excluding Wastage) First Quality Confirming Is 226 Or 2062 Make-Sail/Tata/Jsw Or Equivalent Along With Test Certificate, 2 Side Rubber Seal 1 Bottom Rubber Seal M16X75Mm Full Thread Bolt Nut Along With Washer-415 Nos M28X200 Full Thread Ht Bolt Nut Along With Double Washer-32 Nos To Bommanhalli Pick Up Dam Site.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 29.59 Lac

Ref. No: 29641273

KARNATAKA POWER CORPORATION LIMITED

1.Operation Of Stoplog: Lowering Lifting And Proper Stacking Of Seven Crest Stoplog Elements By Operating Gantry Carne And Sealing. 2. Dismantling Work: Dismantling Of All Existing Rubber Seals By Lifting Of Radial Gate Keeping On The Temporary Platform For Level Keeping Right Angle Checking And Etc. Dismantling Of Corroded Skin Plate Vertical Girders T Girder Pulleys Shaft Wire Rope Pulley Support And Other Associated Parts Etc Complete Including Scaffolding Cutting Gas All Tools And Tackles Gas Labour Etc. Lifting Of All Removed Steel To The Top Of Dam.10.85Mt.3. Design Fabrication Supply Erection Testing And Commissioning Of Radial Gate Consisting Of Skin Plate Stiffeners Horizontal Girders Pulley Supports Bracings Rubber Seals Clamps Etc., With All Accessories For Spillway Including Cost Of All Materials Machinery Labour Cutting Bending Aligning Anchoring Welding Finishing Cleaning Applying One Coat Of Zinc Rich Epoxy Primer And Three Coats Of Cold Applied Coal Tar Epoxy Paint Seal Fixing Etc. 4.Fabrication And Erection: Cutting Drilling Bending Machining V Cutting Machining Drilling Hole To Skin Plate For Rubber Seal Fixing Complete Welding By Following Standard Practices By Using Elctrode 7018 With Preheating Facility Transportation Loading Unloading Etc,. Dpt Test Of Important Welding Joints As Directed By Kpcl. Fixing Of Skin Plate T Girder Vertical Girder Existing Pulley And Supports Stiffeners Pulley Bracket Pulley Shaft And Roller Bracket Etc. Including Welding Grinding And Machining Labour Tools And Tackles Required Gas Set Electrode Winch Welding Set Cutting Set And All Tools And Transportation If Required Etc, Complete.-10.97Mt. Steel Consumption Will Be Considered As Per Actual Quantity Utilized Repair Works. 5.Chipping Of Concrete Around Yoke Girder By Using Heavy Drilling Machine. The Drilling Machines Shall Be Provided By The Agency. 6.Overhauling Of Hoist Unit: Complete Overhauling Of Hoist Units Which Includes Lubrication Replacement Of Gear Oil, Motor Maintenance Like Megger, Checking Of Connections Hoist Unit Painting Replacement Of Hoist Unit Coupling Fasteners, Manual Operation Setting Limits Switch Supply And Setting, Wiring And Setting Upper Pulley Servicing Position Indicator Chain And Sprocket Setting And Ensure Full Condition Of Operation. 7.Commissioning And Testing Of Radial Gate: Lifting After Attending The Work And Checking Of Radial Gate Operation Before Fixing Of Seal To The Height Of 9.60 Meter Inspection And Setting Of Balance Of Gates By Operating Several Times Till Ensuring Of Full Operational Condition. Providing Temporary Platform, Fixing Of New Rubber Seal. Trail Operation To The Full Height 9.60 Mtr After Fixing Of Rubber Seal. 8.Structural Steel: The Area Of Replacement Of Structural Steel Of Radial Gate Is Considered On Visual Inspection While Preparing The Estimation However The Area Of Replacement Of Steel Is To Be Considered Based On Actual Damage Of Gates And Has To Be Attended Accordingly As Per The Direction Of Engineer In Charge. Total Quantity Of Structural Is To Be Replaced Is 10.85Mt Wastage Is In The Scope Of Agency. Replacement And Resetting Of Trunion Foundation Bolts, Chipping Of Concrete Around Yoke Girders Of 0.5 Cum And Plastering Around Such A Way That Yoke Girder Shall Have Free Movement Is Included In Scope Of Work.9.Supply And Transportation Of Steel-10.97 Mt (Excluding Wastage) First Quality Confirming Is 226 Or 2062 Make-Sail/Tata/Jsw Or Equivalent Along With Test Certificate, 2 Side Rubber Seal 1 Bottom Rubber Seal M16X75Mm Full Thread Bolt Nut Along With Washer-415 Nos M28X200 Full Thread Ht Bolt Nut Along With Double Washer-32 Nos To Bommanhalli Pick Up Dam Site.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 29.59 Lac

Ref. No: 29641273

KARNATAKA POWER CORPORATION LIMITED

Lifting Beam Rectification: Shaft Alignment Replacement Of 12Mm Pin Plate, Removing And Welding Of 2Nos New Pulley Shaft Support Plate. Lifting Beam Pulley Servicing And Making Free Rotation-1Nos. Rectification Of Roller: Roller Washer Plate Cutting -2 Sides And Fixing Of Total 16 Nos Of Roller Washer Dia 200Mm 8Mm Thick. -16Nos. Removing Of Rollers, Roller Cover Plate 2 Side Drilling And Tapping Of 12 Nos Of Counter Sunk Bolt For One Roller -8 Nos. Supply And Fixing Of Suitable M10 Counter Sunk Bolt For Roller Cover Plate.-96Nos. Roller And Pin Cleaning For Lubrication, Bearing Removing And Fixing Of New Bearing Of Size Id=100Mm, Od=180Mm Width=60Mm(Approximately)- 8Nos. Supply New Bearing Id=100Mm Od=180Mm Width 60Mm (The Size Of Bearing Mentioned Nearest Size The Exact Size Has To Be Considered After Dismantling Of Roller)-8 Nos. Removing Of Rubber Seal Bolt Cutting And Removing Of Seal Seal Clamp Fabrication-Side Top And Bottom - M12X80-160Nos. - Ls. Supply And Fixing Of New Two Side Rubber Seal 45Bulb 14Mm Thick And Total Length 6.6 Mtr, (Including All Materials And Consumable)-6.6 Mtr. Supply And Fixing Of New Corner Rubber Seal 300X300Mm 45Bulb And 14Mm Thick Left And Right Side (Including All Materials And Consumable)-2Nos. Supply And Fixing Of New Bottom Flat Seal 100Mm Width 20Mm Thick. -3.4 Mtr. Supply And Fixing Of New M12X80 Bolt And Nut With Double Washer-160Nos And Tightening. Supply And Fixing Of 4 Nos Guide Shoes Along With 4 Heavy Duty Springs And 4 M16X100Mm Bolt With 16 Nut With Washer For Each Guide Shoe Assembly. Total Bolts=16 Nos And 64 Nuts With Washer. Supply Of Ci Counter Weight Blocks Of Size 300X100X50Mm.).-2000Kg. Removing Of Entire Counter Weight Blocks And Balancing Of Counter Weight The Weights Should Be Equally Distributed All Along The Gate And Locking. Attending Structural Repairs At Gate Joint Plate, Counter Weight Lock Plate, Gate Stiffeners And End Girder Including Gas Cutting, Welding Etc., (Including All Materials And Consumable)-2000Kg. Gate Touch Paint, Rubber Seal Clamp Plate With Coal Tar Epoxy Paint With Two Coat. Consumable, Tools And Tackles Required And Other Equipment Required Carrying Out Work In Safe Manner. A)Electricity Required To Execute The Work At Site Will Be Provided By Kpcl If Available. It Is Observed Frequent Interruption Of Kptcl Power Supply Because Of Difficult Area Which Has To Be Considered Before Quoting. B)Provision Of Safety Apparatus And Equipment. C)Accommodation Will Be Provided On Chargeable Basis In Ambikanagar Colony Depends On Availability. D)Transportation: All The Transportation Of Men And Material Is Included.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 15.81 Lac

Ref. No: 29641260

KARNATAKA POWER CORPORATION LIMITED

Lifting Beam Rectification: Shaft Alignment Replacement Of 12Mm Pin Plate, Removing And Welding Of 2Nos New Pulley Shaft Support Plate. Lifting Beam Pulley Servicing And Making Free Rotation-1Nos. Rectification Of Roller: Roller Washer Plate Cutting -2 Sides And Fixing Of Total 16 Nos Of Roller Washer Dia 200Mm 8Mm Thick. -16Nos. Removing Of Rollers, Roller Cover Plate 2 Side Drilling And Tapping Of 12 Nos Of Counter Sunk Bolt For One Roller -8 Nos. Supply And Fixing Of Suitable M10 Counter Sunk Bolt For Roller Cover Plate.-96Nos. Roller And Pin Cleaning For Lubrication, Bearing Removing And Fixing Of New Bearing Of Size Id=100Mm, Od=180Mm Width=60Mm(Approximately)- 8Nos. Supply New Bearing Id=100Mm Od=180Mm Width 60Mm (The Size Of Bearing Mentioned Nearest Size The Exact Size Has To Be Considered After Dismantling Of Roller)-8 Nos. Removing Of Rubber Seal Bolt Cutting And Removing Of Seal Seal Clamp Fabrication-Side Top And Bottom - M12X80-160Nos. - Ls. Supply And Fixing Of New Two Side Rubber Seal 45Bulb 14Mm Thick And Total Length 6.6 Mtr, (Including All Materials And Consumable)-6.6 Mtr. Supply And Fixing Of New Corner Rubber Seal 300X300Mm 45Bulb And 14Mm Thick Left And Right Side (Including All Materials And Consumable)-2Nos. Supply And Fixing Of New Bottom Flat Seal 100Mm Width 20Mm Thick. -3.4 Mtr. Supply And Fixing Of New M12X80 Bolt And Nut With Double Washer-160Nos And Tightening. Supply And Fixing Of 4 Nos Guide Shoes Along With 4 Heavy Duty Springs And 4 M16X100Mm Bolt With 16 Nut With Washer For Each Guide Shoe Assembly. Total Bolts=16 Nos And 64 Nuts With Washer. Supply Of Ci Counter Weight Blocks Of Size 300X100X50Mm.).-2000Kg. Removing Of Entire Counter Weight Blocks And Balancing Of Counter Weight The Weights Should Be Equally Distributed All Along The Gate And Locking. Attending Structural Repairs At Gate Joint Plate, Counter Weight Lock Plate, Gate Stiffeners And End Girder Including Gas Cutting, Welding Etc., (Including All Materials And Consumable)-2000Kg. Gate Touch Paint, Rubber Seal Clamp Plate With Coal Tar Epoxy Paint With Two Coat. Consumable, Tools And Tackles Required And Other Equipment Required Carrying Out Work In Safe Manner. A)Electricity Required To Execute The Work At Site Will Be Provided By Kpcl If Available. It Is Observed Frequent Interruption Of Kptcl Power Supply Because Of Difficult Area Which Has To Be Considered Before Quoting. B)Provision Of Safety Apparatus And Equipment. C)Accommodation Will Be Provided On Chargeable Basis In Ambikanagar Colony Depends On Availability. D)Transportation: All The Transportation Of Men And Material Is Included.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 15.81 Lac

Ref. No: 29641260

KARNATAKA POWER CORPORATION LIMITED

A. Providing Position Indicator At Kodasalli Dam Unit #1. 1. Dismantling The Existing Position Indicator Switch After Removing All The Electrical Connections To The Operating Panel. 2. Cleaning Or Modification Of Seating Location As Per Site Requirement. 3. Supply Of Newly Procured Position Indicator Assembly And All Its Accessories Such As Cams, Limit Switches, Water Resistant Covers, Connecting Wires Etc. Specification : German, Stromag Maschinen Fabrik Stromag Gmbh-4750, Unna Endschalter Reihe 100 Type: 16, Ne:651 Fv Aufter No-143 1840 230V Ac,6A,100V At Suitable Position And Connecting All Electrical Connection. 4.Installation Of Position Indicator Mechanism And Connecting It To The Operating Panel. 5.Commissioning Of The Switch Shall Be Carried Out As Per The Direction Of Engineer In-Charge. The Switch Shall Operate For The Following Position Of Gate. A) Fully Open B) Crack Open C) Fully Closed D)2 Intermediate Positions E)2 Spare Positions 6. Testing Of The Installed Switch Can Be Demonstrated As Per The Requirement. 7.Other Related Work Like Cleaning And Shifting Of Released Materials To Stores Etc As Per The Instruction Of Engineer In-Charge. B) Renovation Of Hydraulic Power Pack For Penstock Gate Of Unit #1 At Kadra. The Following Works Will Be Carried Out After Obtaining Lc(By Engineer In-Charge) On Unit From Ldc Bangalore. 1. Closing Of Penstock Gate Of Unit#1 To Release Holding Pressure In The System. 2. Replacement Of Power Pack Manifold Along With New Set Of Valves And Components. 3. Replacement Of Cylinder Manifold With New Set Of Components Of Manifold And Other Hydraulic Valves Fixed To The Cylinder Pipelines. 4.Replacement Of Hydraulic Pipelines With Suitable High Pressure Seamless Pipelines And All Hydraulic Hoses. 5.Replacement Of Conservative Tank Hoses With New Ones. 6.Servicing The Oil Tank By Cleaning With Gasoline, Painting Of External Surface And Installation Of External Component Like Oil Filter, Vent System, Replacement Of Gear Pumps, Replacing Window Gasket And Arresting Any External Leakage In Hydraulic System. 7.Testing Of Pressure Lines By Operating Penstock Gate. 8.Monitoring Pressure In The System By Observing The Variation Of Pressure In Pressure Gauges As Well As Position Of Penstock Gate Level Indicator.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 20.63 Lac

Ref. No: 29641254

KARNATAKA POWER CORPORATION LIMITED

A. Providing Position Indicator At Kodasalli Dam Unit #1. 1. Dismantling The Existing Position Indicator Switch After Removing All The Electrical Connections To The Operating Panel. 2. Cleaning Or Modification Of Seating Location As Per Site Requirement. 3. Supply Of Newly Procured Position Indicator Assembly And All Its Accessories Such As Cams, Limit Switches, Water Resistant Covers, Connecting Wires Etc. Specification : German, Stromag Maschinen Fabrik Stromag Gmbh-4750, Unna Endschalter Reihe 100 Type: 16, Ne:651 Fv Aufter No-143 1840 230V Ac,6A,100V At Suitable Position And Connecting All Electrical Connection. 4.Installation Of Position Indicator Mechanism And Connecting It To The Operating Panel. 5.Commissioning Of The Switch Shall Be Carried Out As Per The Direction Of Engineer In-Charge. The Switch Shall Operate For The Following Position Of Gate. A) Fully Open B) Crack Open C) Fully Closed D)2 Intermediate Positions E)2 Spare Positions 6. Testing Of The Installed Switch Can Be Demonstrated As Per The Requirement. 7.Other Related Work Like Cleaning And Shifting Of Released Materials To Stores Etc As Per The Instruction Of Engineer In-Charge. B) Renovation Of Hydraulic Power Pack For Penstock Gate Of Unit #1 At Kadra. The Following Works Will Be Carried Out After Obtaining Lc(By Engineer In-Charge) On Unit From Ldc Bangalore. 1. Closing Of Penstock Gate Of Unit#1 To Release Holding Pressure In The System. 2. Replacement Of Power Pack Manifold Along With New Set Of Valves And Components. 3. Replacement Of Cylinder Manifold With New Set Of Components Of Manifold And Other Hydraulic Valves Fixed To The Cylinder Pipelines. 4.Replacement Of Hydraulic Pipelines With Suitable High Pressure Seamless Pipelines And All Hydraulic Hoses. 5.Replacement Of Conservative Tank Hoses With New Ones. 6.Servicing The Oil Tank By Cleaning With Gasoline, Painting Of External Surface And Installation Of External Component Like Oil Filter, Vent System, Replacement Of Gear Pumps, Replacing Window Gasket And Arresting Any External Leakage In Hydraulic System. 7.Testing Of Pressure Lines By Operating Penstock Gate. 8.Monitoring Pressure In The System By Observing The Variation Of Pressure In Pressure Gauges As Well As Position Of Penstock Gate Level Indicator.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 20.63 Lac

Ref. No: 29641254

KARNATAKA POWER CORPORATION LIMITED

1.Dismantling Of Existing Structural Steel Including Dismembering Including T And P And Scaffolding Wherever Necessary Sorting The Dismantled Material Disposal Of Unserviceable Material And Stacking The Serviceable Material With All Lifts Complete As Per Specifications - 4.64Mt. 2.Fabrication Of Structural Steel Including Primer Painting Including Steel Transporting To Site Hoisting And Erecting Structural Steel Member Fabricated From Rolled Steel Sections Like Channels Angles Flat I-Sections Plates Rails Etc., As Per Drawing Including Coat Of All Materials Machinery Labour Operations Such As Cutting Bending Grinding Welding Etc., And Providing One Coat Of Zinc Chromate Red Oxide Primer After Scrapping And Cleaning The Surface Scaffolding Etc., - 5.59Mt. 3. Providing And Installing Pre Painted Galvalume Sheet. Sheet Shall Be 0.47 Mm +/ - 0.02 Tolerance Mm Zinc-Alu Alloy Coating Az 150 Gsm As Per Astm 1397/755 - 550 Mpa Steel Grade, 5-7 Microns Epoxy Primer On Both Side Of The Sheet And Polyester Top Coat 20-22 Microns Using Self Drilling / Self Tapping Screws Of 25 Mm Length. (Width Up To 500-600 Mm Only) -78.80 Sqm. 4.Providing Synthetic Enamel Paint Of 1St Quality Two Coats Including Supply Of Paint-35.64 Sqm. 5.Providing Cold Applied Coal Tar Epoxy Paint Two Coats Including Supply Of Paint -186.54 Sqm. 6.The Scope Inclusive Of Petty Civil Work Like Plastering If Required. 7.Inclusive Of Removal All The Consumables Tools And Plants. 8.The Sites Kodasalli Dam, Kadra Dam And Supa Dam Are Installed In Different Location. 9.The Sites Is Located Remotely All Transportation Of Material, Men Machine And Accommodation Is Inclusive. 10.Provision Of Safety Equipment And Apparatus Are Inclusive. 11.Electricity Required To Execute The Work At Site Will Be Provided By Kpcl At Free Of Cost If Available. It Is Observed Frequent Interruption Of Kptcl Power Supply Because Of Difficult Area Which Has To Be Considered Before Quoting.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 6.16 Lac

Ref. No: 29641244

KARNATAKA POWER CORPORATION LIMITED

1.Dismantling Of Existing Structural Steel Including Dismembering Including T And P And Scaffolding Wherever Necessary Sorting The Dismantled Material Disposal Of Unserviceable Material And Stacking The Serviceable Material With All Lifts Complete As Per Specifications - 4.64Mt. 2.Fabrication Of Structural Steel Including Primer Painting Including Steel Transporting To Site Hoisting And Erecting Structural Steel Member Fabricated From Rolled Steel Sections Like Channels Angles Flat I-Sections Plates Rails Etc., As Per Drawing Including Coat Of All Materials Machinery Labour Operations Such As Cutting Bending Grinding Welding Etc., And Providing One Coat Of Zinc Chromate Red Oxide Primer After Scrapping And Cleaning The Surface Scaffolding Etc., - 5.59Mt. 3. Providing And Installing Pre Painted Galvalume Sheet. Sheet Shall Be 0.47 Mm +/ - 0.02 Tolerance Mm Zinc-Alu Alloy Coating Az 150 Gsm As Per Astm 1397/755 - 550 Mpa Steel Grade, 5-7 Microns Epoxy Primer On Both Side Of The Sheet And Polyester Top Coat 20-22 Microns Using Self Drilling / Self Tapping Screws Of 25 Mm Length. (Width Up To 500-600 Mm Only) -78.80 Sqm. 4.Providing Synthetic Enamel Paint Of 1St Quality Two Coats Including Supply Of Paint-35.64 Sqm. 5.Providing Cold Applied Coal Tar Epoxy Paint Two Coats Including Supply Of Paint -186.54 Sqm. 6.The Scope Inclusive Of Petty Civil Work Like Plastering If Required. 7.Inclusive Of Removal All The Consumables Tools And Plants. 8.The Sites Kodasalli Dam, Kadra Dam And Supa Dam Are Installed In Different Location. 9.The Sites Is Located Remotely All Transportation Of Material, Men Machine And Accommodation Is Inclusive. 10.Provision Of Safety Equipment And Apparatus Are Inclusive. 11.Electricity Required To Execute The Work At Site Will Be Provided By Kpcl At Free Of Cost If Available. It Is Observed Frequent Interruption Of Kptcl Power Supply Because Of Difficult Area Which Has To Be Considered Before Quoting.

  • Location: Ankola, Karnataka

  • Last Date: 20 Feb 2023

  • Amount: 6.16 Lac

Ref. No: 29641244